7
INSTALLATION and OPERATION MANUAL
INSTALLATION and OPERATION MANUAL
1
Cold water inlet - water supply
2
Check (return) valve
3
Tee
4
Safety (relief) pressure valve
5
Cold water inlet - water tank
6
Stopcock (drainage)
Stop (Shut-off) valves should
never be installed between a
safety (relief) valve and the tank.
It is recommended once a year to
check the operation of the safety
valve.
3. CONNECTING OF SAFETY RELIEF VALVE TO WATER TANK
Содержание SWUP EXT Series
Страница 1: ...serie SWUP EXT vertical 120 150 200 L Solar Water Tanks INSTALLATION and OPERATION MANUAL Versie 0 2...
Страница 2: ...2 INSTALLATION and OPERATION MANUAL...
Страница 8: ...8 INSTALLATION and OPERATION MANUAL 4 TECHNICAL PARAMETERS 4 1 SWUP EXT with one coil...
Страница 15: ...15 INSTALLATION and OPERATION MANUAL...
Страница 16: ...ISO 9001 BUREAU VERITAS Certification tel 359 700 17 343 www burnit bg...