background image

 
 

 

 

TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 

23-EN

10.

 

CONTROLLER 

 
The  controller  is  designed  for  controlling  CH  boilers.  It  is  regulating  the  pump 
responsible for CH water circulation, DHW pump and the fans.  
 
10.1. Controllers view. Explanation of buttons and light indicators. 
This  controller  can  save  up  to  13%  fuel  and  provide  a  constant  water  temperature 
and longer life of your boiler. The heat of the flue gas is used for heating rather than 
last through the flue. 
 

Explanation of buttons: 
 

 - Navigation arrow UP / PLUS 

 

 - Navigation arrow DOWN / MINUS 

 

MENU button - Enter menu / approve settings 
 
EXIT button - canceling settings 

 
 
   - Power switch ON / OFF 
 

 
- Fans 
 
 
CH PUMP - Central heating - pump 

 

 

WUW PUMP - Domestic hot water - pump

 

 
 

-

 

Manual operation

 

 

 
10.1.1.  Fire-up.  The  cycle  begins  when  you  activate  the  fire  up  function  in  the 
controller’s menu and is active until the central heating boiler temperature reaches 
40°C (the default fire-up threshold), on condition that the temperature does not drop 
below this value for 2 min. (the default fire-up time). If these conditions are met, the 
controller  will  switch  to  the  operation  mode  and  the  manual  operation  symbol  on 

Содержание BURNiT Magna WBS-A 450

Страница 1: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL EN Model serial Version i0 1 1 Solid fuel boiler WBS A 450 Magna...

Страница 2: ......

Страница 3: ...0 6 INSTALLATION OF THE HEATING BOILER 10 6 1 Requirements 10 6 2 Assembly disassembly of the boiler housing 11 6 3 Check door tightness 12 7 SETUP OF THE HEATING BOILER 13 7 1 Connecting the boiler t...

Страница 4: ...nd correct installation start up and trouble free operation and maintenance of the heating boiler The heating boiler can be used for heating rooms only in the manner described in this manual Take note...

Страница 5: ...structions Customer must undergo boiler operation maintenance training by authorized installer service shop 1 2 2 Instructions to installation user DANGER of intoxication or explosion Toxic gases may...

Страница 6: ...inimum clearances in your country may differ from the ones specified bellow Please consult with your installer The minimum distance from the heating boiler or exhaust gas pipe to objects or walls must...

Страница 7: ...c hot water DHW circuits upon constant temperature indication signals The power of the intake fans can be regulated in a broad range depending on the used type and condition of the fuel and also the c...

Страница 8: ...agram 2 Relation between wood heating value and water content Table 2 Heating value of the most common wood species 4 TRANSPORTATION OF THE BOILER We recommend to transport the heating boiler to the i...

Страница 9: ...the lower part of the boiler are provided transportation openings Important When installing the boiler the wooden pallet onto which the boiler is placed must be removed by unscrewing the bolted conne...

Страница 10: ...ecessary to maintain combustion Boilers must not be placed in inhabitable rooms All boiler rooms must have correctly calculated vent depending on the boiler output The vent must be protected by means...

Страница 11: ...Rightside upper front panel 1 6 Leftside upper front panel 1 7 Rightside upper back panel 1 8 Leftside upper back panel 1 9 Frontside upper left panel 1 10 Frontside upper right panel 1 11 Frontside c...

Страница 12: ...boiler s air distribution body and fixing it to panels 4 and 13 using 5 25mm screws 8 pcs Step 13 Fix the main switchboard 14 to panel 5 using 5 12mm screws 2 pcs Step 14 Fix the blower fans 16 onto t...

Страница 13: ...outlet must be sturdy and properly sealed to avoid gas leak and allow for easy access for cleaning on the inside The inner section of the flue outlet must not be greater than the effective section of...

Страница 14: ...ssel No shut off fittings may be installed between the relief valve expansion vessel and boiler It is mandatory to install a three way valve Laddomat or similar or a four way mixing valve which to ens...

Страница 15: ...sure you are using dry fuel When using fuels with high percent humidity it is possible that the boiler works for a certain period after refilling with reduced power capacity while the fuel dries enou...

Страница 16: ...lectrical mains which complies with the local regulations Warning Be careful when connecting the circulation water pumps the controller is only capable of sending signals voltage for controlling the p...

Страница 17: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 17 EN Diagram 6...

Страница 18: ...in a closed system Such connections must be performed by a technician service shop authorized for such operations Diagram 7 1 Thermostat 6 Hot water collector 2 Expansion vessel 7 Heating circuit 2 p...

Страница 19: ...LATION and OPERATION MANUAL 19 EN 7 4 2 Connection of BURNiT WBS A Magna boiler in an open system Diagram 8 1 Cold water inlet 5 Return valve 2 Drainage 6 Insulation 3 Air vent line 7 Hot water outlet...

Страница 20: ...the summer 9 BOILER OPERATION 9 1 Loading and ignition the boiler When igniting the boiler for the first time a condensate is formed which is later drained this is not a fault in the boiler The fuel...

Страница 21: ...ts as they obstruct normal heat transfer 2 Dismount the internal protective grates that lay onto the heat exchanging pipes in the combustion chamber of the boiler Clean thoroughly the heat exchanging...

Страница 22: ...period of time at an output lower than 50 When using a circulation pump closed system it is necessary to put a three way thermostatic valve which provides the optimal temperature of the return water T...

Страница 23: ...lue Explanation of buttons Navigation arrow UP PLUS Navigation arrow DOWN MINUS MENU button Enter menu approve settings EXIT button canceling settings Power switch ON OFF Fans CH PUMP Central heating...

Страница 24: ...damping time the controller will switch to the damping mode While in this mode the fan is deactivated and the display shows Damping 10 2 Main page During normal operation in only CH mode the LCD displ...

Страница 25: ...executive element can be switched off and on independently from all the other elements Pressing down MENU starts the fan which remains turned on until the next pressing of the MENU button Pressing do...

Страница 26: ...re It is the difference between the set temperature that is the boiler required temperature and the actual boiler temperature e g if the set temperature has the value of 55 C and the hysteresis is 5 C...

Страница 27: ...m right corner of the main screen 10 9 2 DHW priority WUW Priority Activating the DHW priority will cause the regulator to switch into the DHW priority mode In this mode the WUW pump is activated unti...

Страница 28: ...will show the WUW temperatures screen Set temperature can be changed with the buttons UP and DOWN After few seconds the display will return to its previous state ATTENTION In this mode a non return va...

Страница 29: ...ATTENTION Do not connect the room regulator to external electricity source 10 11 Suspension operation This option allows the user to set the working time of the fans in suspension mode above the set t...

Страница 30: ...s damaged or overheated the fan is disabled Automatic sensor check In case when the CH temperature sensor is missing or damaged an alarm is activated which additional reports the fault on the display...

Страница 31: ...at 63 C and it will remain in the duty mode maintaining the priority temperature of 65 C Fuse The controller has a network protection WT 3 15 A tube fuse ATTENTION Higher current ratings may cause da...

Страница 32: ...nd low chamber resistance Combustion chamber with three way passage of the exhaust gases through the smoke pipes protected by a water mantle Easy cleaning of the fume exhaust tubes thanks to the inspe...

Страница 33: ...igh temperature insulation of mineral wool 4 Fume exhaust tube 5 Water mantle 6 Three pass flue gas flow 7 Combustion chamber 8 Blower fans 9 Metal grate 10 Transportation openings 11 Ash removal door...

Страница 34: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL 34 EN 12 2 Technical parameters...

Страница 35: ...ll load h 5 5 3 5 Operating temperature range Max temperature C 65 85 95 Exhaust gas temperature operation mode C 150 180 Power consumption W 760 Power supply V Hz 230 50 Operating pressure Bar 4 Weig...

Страница 36: ...r recyclable waste containing materials with adverse effect on health and environment According to Directive 2002 96 EC regarding electrical and electronic equipment waste disposal thereof is required...

Страница 37: ...2 TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Страница 38: ...TECHNICAL PASSPORT INSTALLATION and OPERATION MANUAL...

Страница 39: ......

Страница 40: ...aria t 359 54 874 555 f 359 54 874 556 e mail ftrade sunsystem bg 13 Chelopeshko Shose Str 1839 Sofia Bulgaria t 359 2 903 97 80 f 359 54 874 556 e mail sales sunsystem bg www sunsystem bg ISO 9001 20...

Отзывы: