16
In case the installation site is a level surface, mount the inverter to the
horizontal-mounting bracket to meet the mounting angle requirements, as
shown in the Figure below.
Take the following items into account when designing the bracket scheme:
•
Consider onsite climate conditions and take anti-snow and anti-rain
measures if necessary.
•
Ensure that the waterproof connectors are at least 300mm higher than the
ground surface.
•
Bind the cables at the positions 300~350mm away from the DC connector,
AC waterproof terminal, and communication waterproof terminal.
•
The various waterproof terminals should be tightened in accordance with
the torque requirements in this manual to ensure that they are tight and
sealed.
Contact SUNGORW if you have any question.
About X-RACK ordering issues, please contact you local SUNGROW Sales or
SUNGROW authorized distributors.
4.2.4 Installation Clearance Requirements
•
Reserve enough clearance around the inverter to ensure sufficient space for heat
dissipation. (The fans are maintained on the left side of the inverter, and a larger
clearance is required.)
User Manual
Содержание SG36CX-US
Страница 1: ...User Manual PV Grid Connected Inverter SG36_60CX US SG36_60CX US UEN Ver11 202009 WWW SUNGROWPOWER COM...
Страница 2: ......
Страница 6: ......
Страница 10: ...VIII 10 2 Wring Distance of DI Dry Contact 94 10 3 Quality Assurance 95 10 4 Contact Information 96...
Страница 38: ...28 E En nd d 4 Mechanical Mounting User Manual...