Step 5
Insert the terminal base into the corresponding terminal.
Table 5-3
Terminal definition
N
No
o
D
De
effiin
niittiio
on
n
1
RS485 A+
2
RS485 A+
3
RS485 B-
4
RS485 B-
Step 6
If other wiring operations need to be performed on the communication board, finish the
wiring operations before performing the following steps. If otherwise, continue to
perform the following steps.
Step 7
Install the junction box, see
5.7.2 Install the Junction Box
.
Step 8
Pull the cable gently to make sure it is secured, tighten the swivel nut clockwise.
-- -- E
En
nd
d
5.9.4 Connection Procedure (RJ45 Ethernet Port)
Step 1
Remove the communication junction box, see
.
Step 2
Loosen the swivel nut of the junction box and select an appropriate seal according to
cable outer diameter. Lead the cable through the swivel nut, seal, and junction box
successively.
User Manual
Содержание SG36CX-US
Страница 1: ...User Manual PV Grid Connected Inverter SG36_60CX US SG36_60CX US UEN Ver11 202009 WWW SUNGROWPOWER COM...
Страница 2: ......
Страница 6: ......
Страница 10: ...VIII 10 2 Wring Distance of DI Dry Contact 94 10 3 Quality Assurance 95 10 4 Contact Information 96...
Страница 38: ...28 E En nd d 4 Mechanical Mounting User Manual...