background image

14

4

Mechanical Mounting

4.1

Safety During Mounting

Ensure there is no electrical connection before installation.

In order to avoid electric shock or other injury, be sure there is no electricity or

conduit installations before drilling holes.

Risk of injury due to improper handling

Always follow the instructions when moving and positioning the inverter.

Improper operation may cause injuries, serious wounds, or bruise.

System performance loss due to poor ventilation!

Keep the heat sinks uncovered to ensure heat dissipation performance.

4.2

Location Requirements

Select an optimal mounting location for safe operation, long service life, and

outstanding performance.

The inverter with NEMA Type 4X protection can be installed both indoors and
outdoors.

Install the inverter in a place convenient for electrical connection, operation, and
maintenance.

4.2.1 Installation Environment Requirements

The installation environment is free of flammable or explosive materials.

The location should be inaccessible to children.

Содержание SG36CX-US

Страница 1: ...User Manual PV Grid Connected Inverter SG36_60CX US SG36_60CX US UEN Ver11 202009 WWW SUNGROWPOWER COM...

Страница 2: ......

Страница 3: ...s S So of ft tw wa ar re e L Liic ce en ns se es s It is prohibited to use data contained in firmware or software developed by SUNGROW in part or in full for commercial purposes by any means It is pro...

Страница 4: ...Read the manual and other related documents before performing any work on the inverter is carried out Documents must be stored carefully and be available at all times The contents of the manual will...

Страница 5: ...a an na at tiio on n Indicates a situation that if not avoided could result in equipment or property damage Indicates additional information emphasized contents or tips that may be helpful e g to help...

Страница 6: ......

Страница 7: ...ator Panel 7 2 2 5 DC Switch 8 2 3 Circuit Diagram 9 2 4 Function Description 9 3 Unpacking and Storage 11 3 1 Unpacking and Inspection 11 3 2 Identifying the Inverter 11 3 3 Scope of Delivery 12 3 4...

Страница 8: ...Procedure 32 5 5 AC Cable Connection 34 5 5 1 AC Side Requirements 34 5 5 2 Requirements for OT DT Terminal 35 5 5 3 Aluminium Cable Requirements 35 5 5 4 Connection Procedure 36 5 6 DC Cable Connecti...

Страница 9: ...and Install 56 7 3 Login 57 7 3 1 Requirements 57 7 3 2 Login Steps 57 7 4 Function Overview 59 7 5 Home page 60 7 6 Running Information 62 7 7 History Record 64 7 7 1 Fault and Alarm Records 64 7 7 2...

Страница 10: ...VIII 10 2 Wring Distance of DI Dry Contact 94 10 3 Quality Assurance 95 10 4 Contact Information 96...

Страница 11: ...ns that should be followed Perform operations considering actual onsite conditions SUNGROW shall not be held liable for any damage caused by violation of the safety instructions in this manual 1 1 PV...

Страница 12: ...minate the operating license Risk of inverter damage or personal injury Do not pull out the PV connectors when the inverter is running Wait at least 5 minutes for the internal capacitors to discharge...

Страница 13: ...t tiio on n Danger to life due to high voltages Only qualified personnel can open and service the inverter Disconnect the inverter from all the external power sources before service There is a danger...

Страница 14: ...gu ur re e 2 2 1 1 Inverter application in PV power system Inverter cannot connect the PV strings whose positive and negative terminals need to be grounded Do not connect any local load between the i...

Страница 15: ...Product Introduction 2 2 1 Model Description The device model description is as follows Take SG36CX US as an example M Mo od de ell N No om miin na all O Ou ut tp pu ut t P Po ow we er r N No om miin...

Страница 16: ...g bracket 3 Side handles 2PCS used to move the inverter 4 Labels Warning symbols 5 Additional grounding terminals 2PCS use at least one of them to ground the inverter 6 Bottom handles 2PCS used to mov...

Страница 17: ...m 9 1 11 6 9 2 65kg 143 3lbs 2 2 4 LED Indicator Panel As an HMI the LED indicator panel on the front of the inverter can indicate the present working state of the inverter Table 2 1 LED indicator des...

Страница 18: ...the AC and DC sides are powered down The inverter may carry voltage in case of fault Test the inverter before performing operation on it 2 2 5 DC Switch The DC switch is used to disconnect the DC curr...

Страница 19: ...t tiio on n The inverter provides various settable parameters Users can set parameters via the App to meet the requirements C Co om mm mu un niic ca at tiio on n iin nt te er rf fa ac ce e The inverte...

Страница 20: ...the voltage of the PV string to ground is 500Vdc by default and the default value can be modified through the App A AF FC CI I f fu un nc ct tiio on n AFCI activation This function can be enabled to d...

Страница 21: ...spose of the original packing case It is recommended to store the inverter in it 3 2 Identifying the Inverter The nameplate can be found on both the inverter and the packing case It provides informati...

Страница 22: ...A US CA mark of conformity 3 3 Scope of Delivery F Fiig gu ur re e 3 3 2 2 Scope of Delivery a The mounting bracket includes 2 mounting bracket components and 1 connecting bar b The SG36CX US SG60CX U...

Страница 23: ...rage temperature must be always between 40 C and 70 C and the storage relative humidity must be always between 0 and 95 non condensing In case of stacking storage the number of stacking layers should...

Страница 24: ...nds or bruise System performance loss due to poor ventilation Keep the heat sinks uncovered to ensure heat dissipation performance 4 2 Location Requirements Select an optimal mounting location for saf...

Страница 25: ...in and forest coverage Prevent the inverter from direct exposure to sun rain and snow The inverter should be well ventilated Ensure air circulation Never install the inverter in living areas The inver...

Страница 26: ...s 300 350mm away from the DC connector AC waterproof terminal and communication waterproof terminal The various waterproof terminals should be tightened in accordance with the torque requirements in t...

Страница 27: ...ground surface is determined according to the bending radius of the AC cable used and the installation environment In addition the following conditions must be met The distance between the bottom of...

Страница 28: ...s as shown below In case of back to back installation reserve specific clearance of at least 500m between the two inverters as is shown below Install the inverter at an appropriate height for ease of...

Страница 29: ...ted to the following recommended ones If necessary use other auxiliary tools on site Table 4 1 Tool Specification N No o S Sp pe ec ciif fiic ca at tiio on n a M2 M6 b M4 M6 M8 c Drill bit 12 14 d Inc...

Страница 30: ...the side handles and bottom handles Inappropriate moving operation may cause personal injury It is recommended that at least two installers carry the inverter together and wear protective equipment su...

Страница 31: ...inverter and stop to check for safety when the inverter is 100mm above the ground Continue hoisting the device to the destination after ensuring the safety Step 4 Remove the lifting rings and reassem...

Страница 32: ...ensions of mounting bracket T Ty yp pe e L L1 1 L L2 2 H H1 1 H H2 2 SG36CX US 687mm 26 7 640mm 25 2 564mm 22 2 235mm 9 3 SG60CX US 767mm 30 2 720mm 28 3 614 5mm 24 2 285mm 11 2 4 6 PV Tracker Mounted...

Страница 33: ...n n S So ou ur rc ce e Grub screw 6 M4 10 Delivery scope 2 M6 65 Delivery scope Bolt assembly 4 M10 Delivery scope 4 6 2 Mounting Steps Step 1 Assemble the mounting bracket by using the connecting bar...

Страница 34: ...the inverter from the packing case Step 5 Hoist the inverter to the installation position when necessary refer to 4 4 2 Hoisting Transport If the installation position is not high enough skip performi...

Страница 35: ...to expansion bolt specifications Socket wrench Including 16mm socket Wrench Opening 16mm S Sp pa ar re e p pa ar rt ts s I It te em m Q Qu ua an nt tiit ty y S Sp pe ec ciif fiic ca at tiio on n S So...

Страница 36: ...e installation site Step 3 Insert the expansion bolts into the holes and secure them with a rubber hammer Fasten the nut with a wrench to expand the bolt Remove the nut spring washer and flat washer a...

Страница 37: ...5 Take out the inverter from the packing case Step 6 Hoist the inverter to the installation position when necessary refer to 4 4 2 Hoisting Transport If the installation position is not high enough s...

Страница 38: ...28 E En nd d 4 Mechanical Mounting User Manual...

Страница 39: ...ion Ensure that all cables are voltage free before performing cable connection Any improper operations during cable connection can cause device damage or personal injury Only qualified personnel can p...

Страница 40: ...COM1 For Communication module connection Optional COM2 For digital input and output DI DO wiring COM3 For RS485 communication wiring C AC junction box Remove the protective case and use the junction b...

Страница 41: ...e ea a 1 DC cable PV cable complying with 1 500V standard 6 9 12 10AWG 2 Additional Groundin g cable Outdoor single core copper wire cable The same as that of the PE wire in the AC cable 3 4 AC cable...

Страница 42: ...ditional grounding terminal cannot replace the connection of the PE terminal of the AC cable Make sure thoes terminals are both grounded reliably 5 4 1 Additional Grounding Requirements All non curren...

Страница 43: ...river Step 3 Apply paint to the grounding terminal to ensure corrosion resistance E En nd d The grounding screws have been anchored to the side of the inverter before delivery and do not need to be pr...

Страница 44: ...The line to line voltage on the LV side of the transformer should endure the output voltage of inverter When the transformer is connected to to the IT grid to ground withstanding voltage of the LV wi...

Страница 45: ...AC cables to the terminal block Purchase the OT DT terminals according to the following requirements Specification M8 Dimensions a 30mm 8 4mm b 10 5mm c 16mm F Fiig gu ur re e 5 5 2 2 Dimensions of T...

Страница 46: ...ench to remove the four screws on the AC junction box Step 3 Use a Phillips screwdriver to remove the two screws on the transparent protective cover Step 4 Use a allen wrench to remove the screw on th...

Страница 47: ...corresponding terminals Observe the terminal layout on the block Do not connect the phase wires to PE terminal or PE wire to N terminal Otherwise unrecoverable damage to the inverter will occur User M...

Страница 48: ...ips screwdriver Step 9 Secure the cover of the AC junction box and secure it with torx wrench E En nd d 5 6 DC Cable Connection Electric shock The PV array will generate lethal high voltage once expos...

Страница 49: ...1 n SG36CX US SG60CX US n 8 12 and each PV input is designed with an MPP tracker Each PV input operates independently and has its own MPPT In this way string structures of each PV input may differ fro...

Страница 50: ...before finishing electrical connection Use MC4 DC terminals if the maximum input voltage is no more than 1 000V Use MC4 DC terminals if the maximum input voltage is greater than 1 000V To purchase th...

Страница 51: ...F position Skip performing step1 when the actual device is not equipped with DC switches Step 2 Check the cable connection of the PV string for correct polarity and ensure that the open circuit voltag...

Страница 52: ...damage caused Step 4 Follow the foregoing steps to connect PV connectors of other PV strings Step 5 Seal the unused PV terminals with the terminal caps E En nd d 5 7 Communication Junction Box 5 7 1 R...

Страница 53: ...ce 5 9 RS485 Communication 5 9 1 Interface Description As shown in the Figure below the inverter is equipped with three RS485 communication interfaces and one dip switch All three interfaces can be co...

Страница 54: ...communication protocols cannot be adopted at the same time S Siin ng glle e iin nv ve er rt te er r c co om mm mu un niic ca at tiio on n s sy ys st te em m In case of a single inverter communication...

Страница 55: ...he communication cable should be single point grounded F Fiig gu ur re e 5 5 4 4 Configuration of dip switch N 15 The length of the RS485 cable and twisted pair cable should be no longer than 1 200m I...

Страница 56: ...communication junction box see 5 7 1 Remove the Junction Box Step 2 Strip the protection layer and insulation layer by appropriate length Step 3 Loosen the swivel nut of the junction box and select an...

Страница 57: ...o perform the following steps Step 7 Install the junction box see 5 7 2 Install the Junction Box Step 8 Pull the cable gently to make sure it is secured tighten the swivel nut clockwise E En nd d 5 9...

Страница 58: ...tool Step 4 Insert the RJ45 connector to the RJ45 jack Step 5 If other wiring operations need to be performed on the communication board finish the wiring operations before performing the following st...

Страница 59: ...D DO O t te er rm miin na all f fa au ullt t o ou ut tp pu ut t d dr ry y c co on nt ta ac ct t The relay can be set to fault alarm output and user can configure it to be a normally open contact COM N...

Страница 60: ...Max voltage 30Vdc Max current 5A D DI I t te er rm miin na all e em me er rg ge en nc cy y s sh hu ut td do ow wn n d dr ry y c co on nt ta ac ct t the dry contact can be configured to be an emergenc...

Страница 61: ...in Chapter 5 9 3 Connection Procedure Crimp 5 9 3 Connection Procedure 5 11 Communication Module Connection optional Connect the communication module produced by SUNGROW such as WiNet Eye or E Net to...

Страница 62: ...ified with PVRSS which could send or cease sending keep alive signals to RSDs or Smart PV Panels integrated with RSDs according to NEC 690 12 CA22 2 NO 330 regulations When the SUNGROW inverter is con...

Страница 63: ...There is no additional connection for the SUNGROW inverter directly to RSDs SUNGROW PLC transmitter supports most of the popular RSDs or Smart PV panel brands and models Confirm with SUNGROW to check...

Страница 64: ...e inverter for the first time Step 1 Rotate the DC and AC switch of the inverter to the ON position Step 2 Connect the AC switch if applicable between the inverter and the grid Step 3 Connect the DC s...

Страница 65: ...55 A visible place on PV System Disconnect panel Service Entrance panel etc when there are multiple inverters in the PV system User Manual 6 Commissioning...

Страница 66: ...a the Bluetooth connection For maintenance through SUNGROW communication device refer to the related manuals in SUNGROW website Screenshots in this manual are based on the Android system V2 1 6 and th...

Страница 67: ...ogin page click on Local Access at the bottom of the page to go to the next page Step 2 Click on Bluetooth after which the Bluetooth search screen pops up automatically and select the to be connected...

Страница 68: ...support contact SUNGROW to obtain the advanced account and corresponding password Step 4 If the inverter is not initialized you will enter the quick setting screen to initialize protection parameters...

Страница 69: ...requirements of IEEE 1547 IEEE 1547 1 California Electric Rule 21 Hawaiian Electric Co SRD UL 1741 SA V1 1 and Supplement SA In Canadian region conformity to CSA C22 2 No 107 1 01 Step 5 If the invert...

Страница 70: ...e 7 7 5 5 Home page Table 7 1 Home page description N No o D De es siig gn na at tiio on n D De es sc cr riip pt tiio on n 1 Date and time System date and time of the inverter 2 Inverter state Present...

Страница 71: ...rter tracks the PV arrays maximum power point MPP and converts the DC power into AC power This is the normal operation mode shutdown Inverter is stopped Key shutdown Inverter will shutdown operation b...

Страница 72: ...rmally the alarm or fault icon will be displayed in the lower right corner of the inverter icon in power flow chart The user can tap this icon to enter the alarm or fault screen to view detailed infor...

Страница 73: ...n resistance value of the input side to the protection ground Country Information Power Limitation Mode Reactive Power Mode Input Total DC Power DC side total input power MPPT x Voltage The input volt...

Страница 74: ...tory record screen users can check the fault alarm record yield records and event records 7 7 1 Fault and Alarm Records Tap to view fault alarm records as shown in the following Figure F Fiig gu ur re...

Страница 75: ...r D De es sc cr riip pt tiio on n Power curve Show the power output from 5 am to 11 pm in a single day Each point in the curve is the percentage of present power and nominal power Daily energy histog...

Страница 76: ...ve Swipe left to check the power yields histogram 7 7 3 Event Records Click to view event record list Click to select a time segment and view corresponding event records The inverter can at most recor...

Страница 77: ...s System Parameters Tap to enter the system parameter screen on which boot shutdown instruction can be sent to the inverter set the date and time and information such as ARM sorftware version and MDSP...

Страница 78: ...as shown in the following Figure F Fiig gu ur re e 7 7 1 15 5 Running Time PID Parameters Tap to enter PID Parameters screen on which PID recovery function can be enabled or disabled and PID alarm an...

Страница 79: ...ng Figure F Fiig gu ur re e 7 7 1 18 8 Power Regulation Parameters Table 7 6 Active power regulation P Pa ar ra am me et te er r D De ef fiin niit tiio on n S Se et tt tiin ng g d de es sc cr riip pt...

Страница 80: ...determine whether the inverter is in stop state when the limited power reaches 0 Enable Disable Table 7 7 Reactive power regulation P Pa ar ra am me et te er r D De ef fiin niit tiio on n S Se et tt...

Страница 81: ...Active Overload Rate 1000 QP_EnterVoltage 100 0 110 0 QP_ExitVoltage 90 0 100 0 QP_EXitPower 1 0 20 0 QP_EnableMode Yes No Q U Curve Selection of Q U curve Curve A Curve B Curve C QU_V1 Pre set grid v...

Страница 82: ...rid voltage U4 that is reactive according to the grid voltage 100 0 120 0 QU_Q4 Pre set proportion of reactive power according to the grid voltage U4 0 60 0 Overload Rate 1000 QU_EnterPower Pre set ac...

Страница 83: ...nication Parameters screen on which the user can set the deivice address of inverter as shown in the following Figure F Fiig gu ur re e 7 7 2 21 1 Communication Parameters Inappropriate parameter sett...

Страница 84: ...a data cable find the folder iSolarCloud application via iTunes iMazing or iTools and copy the update package to the folder Document update U Up pg gr ra ad de e Tap to enter the firmware upgrade scre...

Страница 85: ...75 F Fiig gu ur re e 7 7 2 23 3 Change password The password shall consisit of 8 20 digits including letters and numbers User Manual 7 iSolarCloud App...

Страница 86: ...side the inverter completely discharge Step 4 Ensure that the DC cable is current free via a current clamp Step 5 Insert a MC4 wrench into the notch and press the wrench with an appropriate force to r...

Страница 87: ...nstalled in the future please refer to 3 4 Inverter Storage for a proper storage method E En nd d 8 3 Disposal of the Inverter Users take the responsibility for the disposal of the inverter Some parts...

Страница 88: ...connected to the grid after the grid returns to normal If the fault occurs repeatedly 1 Measure the actual grid voltage and contact the local electric power company for solutions if the grid voltage i...

Страница 89: ...ntact SUNGROW 005 Grid low voltage The grid voltage is lower than the set protection value Generally the inverter will be reconnected to the grid after the grid returns to normal If the fault occurs r...

Страница 90: ...is lower than the lower limit of the inverter 010 Grid power outage AC switch or circuit is disconnected Generally the inverter will be reconnected to the grid after the grid returns to normal If the...

Страница 91: ...for solutions if the grid parameter exceeds the set value 2 If the fault is not caused by the foregoing reasons and still exists contact SUNGROW 014 10 minute grid overvoltage the grid voltage exceed...

Страница 92: ...ge of the local power company modify the grid voltage imbalance parameter through the App or LCD screen 3 If the fault is not caused by the foregoing reasons and still exists contact SUNGROW 019 020 D...

Страница 93: ...s 038 Device anomaly Wait for the inverter to return to normal Disconnect the AC and DC switches and reconnect the AC and DC switches 15 minutes later to restart the inverter If the fault still exists...

Страница 94: ...ult still exists contact SUNGROW 047 PV input configuration abnormal PV input mode error Shutdown and disconnect the inverter Reset the input mode of the PV array 048 050 053 056 059 060 Device anomal...

Страница 95: ...er the ambient environment is abnormal If so remove the corresponding abnormity 2 If the fault is not caused by the foregoing reasons and still exists contact SUNGROW 088 Electric arc fault 1 Disconne...

Страница 96: ...th PV string needs to be connected If not ignore the alarm and If so check the connection status and make sure it is connected reliably 2 Check if the xth DC fuse is damaged If so replace the fuse 3 I...

Страница 97: ...oing reasons and still exists contact SUNGROW The code 548 to code 563 are corresponding to string 1 to string 16 respectively 564 571 String x reverse connection alarm 1 Check whether the correspondi...

Страница 98: ...rresponding PV strings connected to this inverter maybe still keep alive due to PLC signals injected from other alive inverters once the DC cables are not separated from inverter to inverter In this s...

Страница 99: ...le entry is insufficiently sealed or the gap is excessively large and reseal the entry when necessary Once a year Electrical Connection Check whether all cable are firmly in place Check whether a cabl...

Страница 100: ...nverter may not be cooled down and inverter efficiency may decrease Therefore it is necessary to clean dirty fans and replace the broken fans in a timeiy manner The operation procedure is as follows S...

Страница 101: ...91 Step 5 Reinstall the fan back to the inverter in reverse order and restart the inverter E En nd d User Manual 9 Troubleshooting and Maintenance...

Страница 102: ...2 Max PV input current 26A 4 26A 6 Max current for input connector 30A Max DC Short circuit current per MPPT 45A O Ou ut tp pu ut t A AC C AC output power 36 kVA 113 45 30 kVA 122 50 60 kVA 113 45 50...

Страница 103: ...nsions W H D Inverter 702 595 310 mm 27 6 23 4 12 2 Wire Box 231 295 234 mm 9 1 11 6 9 2 Inverter 782 645 310 mm 30 7 25 4 12 2 Wire Box 231 295 234 mm 9 1 11 6 9 2 Weight 54 kg 119 0 lbs 65 kg 143 3...

Страница 104: ...contact must meet the requirements in the Table below The wiring distance L is the total length of all DI signal cables LK refers to the cable length between the DI dry contact terminal of the kth in...

Страница 105: ...ance is less than 300 number of inverter 10 3 Quality Assurance When product faults occur during the warranty period SUNGROW will provide free service or replace the product with a new one E Ev viid d...

Страница 106: ...rce majeure For faulty products in any of above cases if the customer requests maintenance paid maintenance service may be provided based on the judgment of SUNGROW 10 4 Contact Information Should you...

Страница 107: ...ungrowpower com M Ma alla ay ys siia a Sungrow SEA Selangor Darul Ehsan 60 19 897 3360 service my sungrowpower com P Ph hiilliip pp piin ne es s Sungrow Power Supply Co Ltd Mandaluyong City 63 9173022...

Страница 108: ...n sungrowpower com B Be ellg giiu um m N Ne et th he er rlla an nd ds s a an nd d L Lu ux xe em mb bo ou ur rg g B Be en ne ellu us s Service only NL 31 08000227012 service sungrow emea com P Po olla...

Страница 109: ...Technology Industrial Development Zone 230088 Hefei P R China Tel 86 551 6532 7834 6532 7845 Web www sungrowpower com E mail info sungrow cn Sungrow Power Supply Co Ltd Specifications are subject to c...

Отзывы: