Fasten the wiring terminal with the bolts in the scope of delivery. And the torques are
shown in following table.
B
Bo
olltt
T
To
orrq
qu
ue
e
M16×55
119~140N.m
step 1
Make sure the switch of downstream device is in the OFF position.
step 2
Strip off the insulation cover of the cable with the tripped length of 5mm longer than the
depth of the cable lug.
step 3
Crimp the cable lug. It is advisable to select DT-×× (×× is the cable cross-sectional
area) cable lug.
1
Put the stripped cable inside the cable lug.
2
Tighten the cable lug with relevant tools. Crimp it at least twice.
step 4
Wrap the heat-shrink tubing.
1
A tubing with length 2cm longer than the depth of the cable lug is recommended.
2
Wrap the cable lug with the heat-shrink tubing.
3
Shrink the tubing with hot air blower.
Cable protectors are advisable in the cable crosses if the multi-core cables
are used.
step 5
Connect the cable.
1
Select bolts matching with the cable lug.
2
Attach the cable lug to the AC connection copper bar.
3
Fasten the bolts with screwdriver or spanner.
•
Incorrect connection sequence may cause fire. Pay maximum attention to
the connection sequence.
•
Ensure the firmness of the cable connection. Poor connection or oxidation of
the surface may cause over-heating or fire.
System Manual