43
6.5.3 AC Connection Area at the Bottom
P
Prre
ep
pa
arra
attiio
on
n b
be
effo
orre
e W
Wiirriin
ng
g
1
Remove the protective cover and the ventilation cover of the wiring area on the right
side of the inverter.
2
Expose the copper bars on the cabinet.
3
Take out the AC connection box from the delivery, and remove the left, right and top
covers of the box.
4
Fix the copper bar inside the connection box to the copper bar on the cabinet,
tighten with the bolt M12x55, and the tightening torque is 60~70N.m.
Strictly observe the direction of the copper bar, refer to “6-3 Wiring
copper bar”.
5
Fix the AC connection box with the inverter cabinet, tighten with the bolt : M5x12,
and the tightening torque: 6~8N.m.
A
AC
C C
Co
on
nn
ne
ec
cttiio
on
n A
Arre
ea
a
After fixing, wiring can be performed. The sizes of connection copper bar are as shown
in the figure below.
System Manual
Содержание SG2500HV-30
Страница 2: ......
Страница 8: ......
Страница 39: ...31 A A B B C C D D E E 1 000 2 500 2 500 2 500 2 500 Unit mm System Manual 5 Mechanical Installation...