28
N
No
o
N
Na
am
me
e
C
Strip foundation
D
Ground
E
Protective grid
Construct foundation according to the scheme shown in figure below.
F
Fiig
gu
urre
e
N
Na
am
me
e
20# steel channel
Inverter base
Step
Operation platform
5.3.4 Other Precautions
After fixing, the inverter should be fully welded with the pre-embedded channel steel.
A drainage system should be designed on the installation site to prevent the
inverter from being immersed in water during heavy rainfalls.
Do not plant any trees near the installation site to prevent the inverter from
being damaged by tree leaves or stems.
System Manual
Содержание SG2500HV-30
Страница 2: ......
Страница 8: ......
Страница 39: ...31 A A B B C C D D E E 1 000 2 500 2 500 2 500 2 500 Unit mm System Manual 5 Mechanical Installation...