II
3.2.2 Internal Devices of the Inverter.......................................................... 14
3.2.3 Operations on the DC and AC Side.................................................... 15
............................................................................ 21
5.2.3 Fastening of Connectors................................................................... 26
5.3.2 Foundation Requirements................................................................. 27
5.3.3 Recommended Foundation Construction Plan .................................. 27
................................................................................ 32
6.2 Preparation before Electrical Connections .................................................. 34
6.2.2 Opening the Cable Entries ................................................................ 35
6.3 Circuit Diagram and Cable Connection ....................................................... 36
6.4.1 Checking before Connection............................................................. 37
6.4.2 DC Cable Connection ....................................................................... 37
Содержание SG2500HV-30
Страница 2: ......
Страница 8: ......
Страница 39: ...31 A A B B C C D D E E 1 000 2 500 2 500 2 500 2 500 Unit mm System Manual 5 Mechanical Installation...