System Manual
28
Step 2
Open the right door. Pull the upper and lower latches on the left door, to open the front left
door.
5
6
4
5.7
Clearance Requirement
On site, MV Station works together with the inverter. Required clearances around MV
Station and the inverter are shown in the figure below.
2344
≥
2000
MV Station
Inverter
Inverter
* The distance illustrated in this figure is the minimum values.
** This manual takes the inverter SG3125HV-20 as an example, and the inverter type may
differ in actual project.