System Manual
39
Checking Item
Requirement
Others
Check the bottom of the MV Station and seal the gaps
between the cables with fireproof mud. If cable glands are
used, make sure they are tightened. Seal the unused terminal.
Reassemble the protective grid removed.
Water-proof processing should be done on the foundation of
the MV Station.