24
Sun Enterprise 10000 Dual Power Grid Installation Guide • March 2000
13. Connect the two remaining data cables to the rear option power shelf.
Position the power shelf as necessary to permit visibility and access to the
connectors J11 and J12.
a. Attach the data cable from the status module tray labeled
“B: REAR J11” to J11 on the back of the rear option power shelf.
b. Attach the data cable from the status module tray labeled “B: REAR J12” to J12
on the back of the rear option power shelf.
14. Attach the four remaining power cables to the bus box.
Use the criss-cross method described in Step 4 and attach the connectors as
described in Step 9.