30
Sun Enterprise 10000 Dual Power Grid Installation Guide • March 2000
5. Install the power grid labels to the front, hinge side of all power shelves so that
they are visible when the door is open (
Install the “POWER GRID A” labels to the existing power shelves and “POWER
GRID B” labels to the option shelves.
FIGURE 15
Power Grid Label on Power Shelf
6. Install four AC Input Modules (ACIM) in the power shelves.
Insert the ACIMs fully and carefully so that the EMI gaskets on the sides of the
ACIMs are not damaged. Tighten the 1/4 turn captive fasteners on the ACIMs.
7. Insert the power supplies fully and tighten the 1/4 turn captive fasteners.
Power grid label (typical)