Installation Procedure
35
9. Install the AC input power cable in the AC sequencer.
a. Route the cable down the chassis side wall.
b. Fasten the cable with the cable ties in the lanced loops of the chassis structure.
c. Fasten the cable at the bottom with a cable clamp using an available M4 tapped
hole (
).
Note –
The front and rear AC sequencers should not be connected to the same
power grid.
FIGURE 19
Equipment Installation in the Front 4U Panel
RJ-45 connectors
AC sequencer
Hub
Status module
Status module
Input power
Ground cable
cable assembly
tray assemly
overlay
Status module
tray assemly