When you insert a loopback connector in to the T port, no green light appears to
indicate a proper insertion. However, the test will run and be valid.
■
If only one of the links has failed and the I/O is traveling over the remaining link,
I/O is automatically routed over the repaired link by the switch after the failed
link is replaced and recabled. No manual intervention is required.
■
If both links have failed and a LUN failover has occurred, you must manually run
a
failbackt3path
command to return the paths to their optimal state, after you
repair and recable the links.
▼
To Isolate the T1 or T2 Data Path
1. Run
linktest
from the Storage Automated Diagnostic Environment for a guided
isolation procedure.
2. After replacing the failed FRU, run
failbackt3path
, if needed.