E24254-01
79
4
Site Preparation
Use this chapter to
prepare for the installation by reviewing the information and
completing the
Site Planning Checklist
.
Other information in this chapter includes planning topics and requirements to help
prepare for an installation of the SL8500 Modular Library System.
■
Site Planning Checklist
Use the following checklist to ensure that the customer is ready to receive the
library and to ensure that you are ready to start the installation.
Table 38. Site Planning Checklist
Question Answer
Comments
Delivery and Handling
Does the customer have a delivery dock? If
not, where will the equipment be delivered?
Yes
❏
No
❏
If a delivery dock is available, what are the
hours of operation?
___________
Are there street or alley limitations that may
hinder the delivery?
(Limited access, one-way traffic, truck size)
Yes
❏
No
❏
Is the dock close to the computer room
where the equipment will be installed?
If no, how far does the equipment need to
be moved?
Yes
❏
No
❏
Distance:
____________
Is an elevator required to move the
equipment to the appropriate floor?
What type of elevator is being used?
(Class A or C, freight, low-rise, passenger,
service, hydraulic, pneumatic, etc.)
Yes
❏
No
❏
Description:
What is the capacity of the elevator?
What are the dimensions of the elevator?
Are there any ramps or slopes that you
need to move equipment over to get to the
installation site?
What is the angle?
Yes
❏
No
❏
Degrees:____
Содержание StorageTek StreamLine SL8500
Страница 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Страница 98: ...Site Survey Forms 78 SL8500 Systems Assurance Guide July 2011 E24254 01 Figure 21 Content Management Plan ...
Страница 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Страница 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 163: ...E24254 01 Appendix A Content Management 141 Content Management Figure 47 Content Management Work Sheets ...
Страница 164: ...Content Management 142 SL8500 Systems Assurance Guide July 2011 E24254 01 Figure 47 Content Management Work Sheets ...
Страница 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Страница 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Страница 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Страница 277: ......
Страница 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...