E24254-01
Appendix G TCP/IP Connectivity 197
TCP/IP Connectivity
Host and SL8500 Routing Tables:
CLI Commands
The CLI commands to configure this example are:
Addresses
1. Take both ports down.
SL8500> network ip link set dev 2A down
SL8500> network ip link set dev 2B down
2. Add the
IP addresses
and
subnet masks
for both ports.
SL8500> network ip address add 129.80.64.100/23 dev 2A
SL8500> network ip address add 192.168.10.111/24 dev 2B
3. Bring both ports back up.
SL8500> network ip link set dev 2A up
SL8500> network ip link set dev 2B up
Routing
Because this example is using
two
host IP address
into two
SL8500 ports and
involves multiple routers, you need to describe the route using the router
closest
to the SL8500 (the format is host router address via SL8500 port
router addresses).
4. Add the route for host access through the subnets.
network ip route add 129.80.91.200 via 129.80.65.254
network ip route add 129.80.81.199 via 192.168.10.254
You must also configure the routing on the ACSLS server and/or system
mainframes. Refer to the appropriate ACSLS or ELS/HSC documentation.
Host Routing Table
Destination Gateway
Netmask
129.80.91.0
*
255.255.255.0 (/24)
129.80.81.0
*
255.255.255.0 (/24)
129.80.64.0
129.80.91.254
255.255.254.0 (/23)
192.168.10.0
129.80.81.254
255.255.255.0 (/24)
SL8500 Routing Table
Destination Gateway
Netmask
192.168.10.0
*
255.255.255.0 (/24)
129.80.64.0
*
255.255.254.0 (/23)
129.80.91.0
129.80.65.254 255.255.255.0
(/24)
129.80.81.0
192.168.10.254 255.255.255.0
(/24)
Содержание StorageTek StreamLine SL8500
Страница 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Страница 98: ...Site Survey Forms 78 SL8500 Systems Assurance Guide July 2011 E24254 01 Figure 21 Content Management Plan ...
Страница 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Страница 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 163: ...E24254 01 Appendix A Content Management 141 Content Management Figure 47 Content Management Work Sheets ...
Страница 164: ...Content Management 142 SL8500 Systems Assurance Guide July 2011 E24254 01 Figure 47 Content Management Work Sheets ...
Страница 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Страница 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Страница 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Страница 277: ......
Страница 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...