Introduction
40 SL8500: Systems Assurance Guide • July 2011
E24254-01
Redundant Electronics Network Entries Worksheet
When preparing the network and connections—as a best practice—complete
a network entries worksheet for each port of the SL8500 library.
Important:
•
When connecting more than one interface to an SL8500 library, the
connections should be through
different subnets
for redundancy.
If one subnet should fail, communications between the hosts and the
libraries continue over the other subnet.
•
When connecting an interface to Port 2A, a service representative must
configure the routing and possibly assign policies for that port (2A) using
the command line interface.
Note: Port 2B is the default port for the library; no routing tables are
required when connecting to that port. See
“Host Connections” on
page 220
for more information.
Description IP
Address
HB
C 1
Po
rt 2B
Library Software Version
Host name to Port 2B
HBC Card Port 2B
Gateway Port 2B
Netmask
Po
rt 2A
Library Software Version
Host name to Port 2A
HBC Card Port 2A
Gateway Port 2A
Netmask
HBC 2
Po
rt 2B
Library Software Version
Host name to Port 2B
HBC Card Port 2B
Gateway Port 2B
Netmask
Por
t 2A
Library Software Version
Host name to Port 2A
HBC Card Port 2A
Gateway Port 2A
Netmask
Содержание StorageTek StreamLine SL8500
Страница 4: ...Summary of Changes iv SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 12: ...Contents xii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 18: ...Tables xviii SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 76: ...Introduction 56 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 97: ...E24254 01 Chapter 3 Site Survey Forms 77 Site Survey Forms Figure 21 Content Management Plan ...
Страница 98: ...Site Survey Forms 78 SL8500 Systems Assurance Guide July 2011 E24254 01 Figure 21 Content Management Plan ...
Страница 137: ...E24254 01 Chapter 4 Site Preparation 117 Site Preparation ...
Страница 138: ...Site Preparation 118 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 163: ...E24254 01 Appendix A Content Management 141 Content Management Figure 47 Content Management Work Sheets ...
Страница 164: ...Content Management 142 SL8500 Systems Assurance Guide July 2011 E24254 01 Figure 47 Content Management Work Sheets ...
Страница 198: ...Electrical Conversions 176 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 206: ...Comparisons 184 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 233: ...E24254 01 Appendix H Partitioning 211 Partitioning Make copies as necessary ...
Страница 240: ...Partitioning 218 SL8500 Systems Assurance Guide July 2011 E24254 01 ...
Страница 251: ...E24254 01 Appendix J Work Sheets 229 Work Sheets Figure 73 Content Management Work Sheet ...
Страница 276: ...Index 254 SL8500 Systems Assurance Guide June 2011 E24254 01 ...
Страница 277: ......
Страница 278: ...Oracle Corporation Worldwide Headquarters 500 Oracle Parkway Redwood Shores CA 94065 U S A ...