Chapter 2
Installing Servers and Back-End Storage
17
■
Mounting hardware as listed below:
Note –
The kit may have extra screws.
The rails can be adjusted to fit the cabinets.
▼
To Prepare the Controller and Expansion
Enclosures
Caution –
Two people are needed to lift and move the controller enclosure and
expansion enclosures. Use care to avoid injury. An enclosure can weigh up to 95
pounds (43 kg). Do not lift the front of the enclosure; this can cause damage to the
drives.
1. Unpack the enclosure.
2. Check the contents of the box for the following items:
■
Sun StorEdge 5300 enclosure (controller or expansion)
■
Ship kit for the controller enclosure
■
Two 5-meter optical Fibre Channel (FC) cables for connecting the RAID
controller enclosure to your Sun StorageTek 5320 NAS Appliance
■
Two 6-meter RJ45 -RJ45 Ethernet cables
■
Sun StorEdge 6130 Array Rack Alignment Template
■
Documentation URL brochure
■
Ship kit for the expansion enclosure
■
Two 2-meter copper FC cables
■
Documentation URL brochure
Quantity
Type
Used With
8
8-32 (small) panhead screw
All Sun cabinets
8
10-32 (medium) panhead screw
Sun StorEdge Expansion cabinet
12
Metric M6 (large) panhead screw
Sun Rack 900/1000 cabinet
Содержание StorageTek 5320
Страница 16: ...xvi Sun StorageTek 5320 NAS Appliance and Gateway System Getting Started Guide May 2006 ...
Страница 72: ...52 Sun StorageTek 5320 NAS Appliance and Gateway System Getting Started Guide May 2006 ...
Страница 94: ...74 Sun StorageTek 5320 NAS Appliance and Gateway System Getting Started Guide May 2006 ...
Страница 118: ...98 Sun StorageTek 5320 NAS Appliance and Gateway System Getting Started Guide May 2006 ...
Страница 200: ...180 Sun StorageTek 5320 NAS Appliance and Gateway System Getting Started Guide May 2006 ...