![Sun Microsystems Enterprise 250 Скачать руководство пользователя страница 305](http://html.mh-extra.com/html/sun-microsystems/enterprise-250/enterprise-250_owners-manual_1392728305.webp)
Action
1. Replace the drive indicated by the failure message.
Symptom
Disk drive or CD-ROM drive fails to boot or is not responding to commands.
Action
Test the drive response to the
probe-scsi-all
command as follows:
1. At the system
ok
prompt, enter:
ok reset-all
ok probe-scsi-all
2. If the SCSI device responds correctly to
probe-scsi-all
, a message similar
to the one above is printed out.
If the device responds and a message is displayed, the system SCSI controller has
successfully probed the device. This indicates that the main logic board is
operating correctly.
a. If one drive does not respond to the SCSI controller probe but the others
do, replace the unresponsive drive.
b. If only one internal disk drive is configured with the system and the
probe-scsi-all
test fails to show the device in the message, replace the
drive. If the problem is still evident after replacing the drive, replace the
main logic board. If replacing both the disk drive and the main logic board
does not correct the problem, replace the associated UltraSCSI data cable
and UltraSCSI backplane.
SCSI Controller Failures
To check whether the main logic board SCSI controllers are defective, test the drive
response to the
probe-scsi
command. To test additional SCSI host adapters added
to the system, use the
probe-scsi-all
command. You can use the OBP
printenv
command to display the OpenBoot PROM configuration variables stored in the
system NVRAM. The display includes the current values for these variables as well
as the default values. See “OBP
printenv
Command” on page 264 for more
information.
1. At the
ok
prompt, enter:
Diagnostics and Troubleshooting
271
Содержание Enterprise 250
Страница 2: ...USA 650 960 1300 fax 650 969 9131 ...
Страница 3: ...Sun Enterprise 250 Server Owner s Guide Part No 805 3389 11 Revision A June 1998 ...
Страница 44: ...10 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 45: ...CHAPTER 2 Photographic Tour of System System View 11 ...
Страница 46: ...Figure 2 1 1 Side Access Panel on page 19 12 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 48: ...Figure 2 2 14 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 50: ...Figure 2 3 12 Diskette Drive on page 22 16 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 52: ...Figure 2 4 18 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 69: ...Power Distribution Board Photographic Tour of System 35 ...
Страница 73: ...UltraSCSI Backplane Figure 2 20 For information related to this part see Photographic Tour of System 39 ...
Страница 88: ...54 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 102: ...68 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 160: ...126 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 212: ...178 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 226: ...Figure 9 8 192 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 228: ...194 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 266: ...232 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 310: ...276 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 324: ...290 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 330: ...296 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 346: ...312 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...
Страница 356: ...TABLE D 6 continued 322 Sun Enterprise 250 Server Owner s Guide Revision A June 1998 ...