Note –
Do
not
press the front panel Power button. The server automatically enters standby
power mode when inserted into a powered-on chassis. Pressing the Power button puts the
server in full power mode and boots the system.
■
“How to Power On the Server Module to Full Power Mode” on page 23
■
“LED Functions” on page 68
▼
How to Power On the Server Module to Full Power
Mode
Use this procedure to place the server in to the operational full power mode.
Note –
The Sun Blade X6275 M2 Server module is a dual-node server. If necessary, use this
procedure for
both
nodes.
■
This task assumes that the chassis is powered on.
■
This task assumes that you are at the server module working locally.
■
See
“Power Modes” on page 19
.
■
See
“Power Button and Power OK LED” on page 20
.
Install the server module in the Sun Blade chassis. See
“How to Install the Server Module in the
Chassis”on page 35
.
The green OK LED on the front panel of the server module blinks (once every three seconds),
indicating that the server module is in standby power mode.
To power on the server module, use a pen, or other nonconducting pointed object, to quickly
press and release the Power button on the server module front panel.
When the main power is applied to the server module, the green OK LED remains lit (does not
blink), indicating that the server is in full power mode.
■
“How to Power Off the Server Module” on page 23
■
“LED Functions” on page 68
▼
How to Power Off the Server Module
Use this procedure to power off the server module with the front panel Power button. You can
power off the server module gracefully or immediately.
See Also
Before You Begin
1
2
See Also
Powering On and Off the Server Module
23
Содержание Blade X6275 M2
Страница 1: ...Sun Blade X6275 M2 Server Module Service Manual Part No 821 1084 March 2013...
Страница 6: ...6...
Страница 12: ...12...
Страница 18: ...18...
Страница 136: ...136...