6
1.0 Quick start
1.1 Dealer PDI check list
Check transport tyre pressures (see data table in first section)
Check wheel nuts, (270N/m 8 stud) (450n/m 10 stud)
Check bout marker measurements
Set fan speed (start with low fan speed and raise slowly, check back pressure)
Check for oil leaks with warm oil
Check seed on/off system sensitivity i.e. either hydraulic ram & sensor or finger
switch responds accurately and quickly?
Set up to match tractor, drawbar height and length extension
Fit electric power lead direct to tractor battery
Set working depth according to seed type and ground conditions
Ensure tractor is correctly balanced and ballasted
Check forward speed reading is correctly calibrated
Train customer to use machine
o
Safe coupling and uncoupling to tractor
o
Free flow return in particular
o
Set coulter pressure
o
Setup machine to suit different crops
o
Coulter settings
o
Calibrate drill
o
Change seed rate
Содержание DTS 3m
Страница 46: ...46 9 5 Coulter system 9 6 Fan Motor system...
Страница 47: ...47 9 7 Wings Markers system...