
51
cyberlab original instructions
© STULZ GmbH – all rights reserved EN/02.2018/G17F
Connections on BNB humidifier, rear side
BNB connection box
control line
power line
PE-conductor
control line
power line
Electrical connection of the external humidifier
The control line and the power line of the external BNB type humidifier are 2 m long and lie reeled up in the
CyberLab unit.
• Route the control line and the power line through the openings shown below into the CyberLab unit and
connect the lines in the BNB connection box according to the wirring diagram. The other end of the cables
is fitted with a plug, which you must insert on the connectors at the rear side of the BNB.
A PE line lies reeled up in the lower section of the CyberLab unit.
• Route the PE line through the openings shown below out of the CyberLab unit and connect the line at the
external humidifier according to the wirring diagram.
Respect the warning notices in the BNB manual on page 49 and 50. All warning notices, which concern
the control cabinet as well as the pages 51, 52 and 56 are not applicable. If you want to extend the cables,
observe the information in chapter 7.5.2 of the BNB manual.
Commissioning
To do this, read the pages 57-60 of the BNB manual.
operation
To do this, read the pages 61-62 of the BNB manual. The pages 63-70 are not applicable. The humidifier is
controlled by the humidifier menu of the C7000 controller.