f)  Test the operation of the Temperature & Pressure relief valve by turning the manual  

 

test cap and ensure the water flows freely and safely to waste.

g)  Test the operation of the combination valve PRV by turning the manual test cap and  

 

ensure the water flows freely and safely to waste. 

h)  Set hot water Mixing valve to ‘max’.

5.7 

Heating system pre-fill check: 

a)  Check filling loop is fitted correctly 

b)  Check all radiator valves are fitted and tight. 

c)  Check all radiator air vents are closed. 

d)  Check all drain valves are closed. 

5.8 

Flushing and filling heating system:

a)  Carry out fill only after hot water system has been flushed and cleaned. 

b)  Close all radiator valves. 

c)  Connect filling loop and fill heating pipes using last radiator in line to bleed air. 

d)  Check for leaks 

e)  Using hose or suitable container, drain heating pipes. 

f)  Repeat flushing pipes as required and fill. 

g)  Open radiator valves and bleed air to fill all radiators. 

h)  Drain heating system again. 

i)  On final refill, add proprietary additives as manufactures instructions. Fill to 1 bar. 

j)  Set pressure gauge red arrow to the black arrow (cold fill pressure – 1 bar).

Electrical

5.9 

Electrical check:

a)  Check that all wiring including earth wiring has been installed correctly 

b)  Check tri-core heater cover, Electrastream controller cover and all other electrical  

 

covers are correctly fitted.

c)  Check tundish is positioned so that any spillage or spray from the tundish would not  

 

contact any electrical components and is visible. 

d) Check 

ALL

 wiring connections have been made

e)  Check the required earth continuity conductors have been fitted. 

5.10 

Setting and testing controls:

 

a)  Switch on Electrastream mains isolator. 

b)  On the Electrastream control unit, set date and time (see Fig. 12)

c)  Set times to suit economy tariff. 

d)  Set target temperature to 65°C

e)  If heating/hot water is not On press Boost and set room thermostat for heat. 

f)  Wait for the cylinder and heating to heat up. 

g)  Check for leaks and bleed the system again when it is up to temperature. 

h)  Check pressure gauge black arrow, this will show the heating system working   

 

pressure. This should be less than 2.8 bar. 

i)  Check operation of the Electrastream control unit – Fig. 11. 

j)  When timer is set for heat and the room thermostat is set above the ambient – the  

 

motorised valve should be open and the pump should be running. When the room  

 

thermostat is reset below ambient the pump should stop and the valve should close.  

 

When the timer is not set for heat, the pump should no run and the valve should be  

 

closed regardless of room thermostat setting. 

k)  Fill in details in the log book.

Содержание BEP 130

Страница 1: ...ction booklet with the home owner as it contains important guarantee maintenance and safety information BEP 130 Pt No 46727 BEP 150 Pt No 46728 Read this manual carefully before commencing installatio...

Страница 2: ...btu system suitable for flats apartments offices and other small dwellings STORAGE If this product is not to be installed immediately on receipt ensure that it is stored in a dry frost and vibration...

Страница 3: ...ome into contact with any electrical device before the electrical supply is turned back on z z The Electrastream unit must be commissioned by a competant person failure to do so will invalidate the gu...

Страница 4: ...removed from its packaging check for any damage prior to installation If any damage is found contact Altecnic Ltd within 24 hours of receipt Item Description Qty Item Description Qty Electrastream uni...

Страница 5: ...ing cupboards and enclosed compartments Humidity may also present a problem within airing cupboards For servicing and cylinder replacement clearance is required all round the cylinder recommended 100...

Страница 6: ...guarantee Higher water temperatures of 65 C and above can cause excessive scale The location and position of the water conditioner should be as per the manufacturer s recommendations 1 5 Check water p...

Страница 7: ...ffs The valve must be set to suit the pressure of the system refer to the manufacturer s instructions 1 12 Room thermostat not supplied A standard room thermostat with no built in timers or functions...

Страница 8: ...tor RCD MCB Cylinder TPR valve 6 bar Thermostatic mixing vlave Hot water outlet 22 mm connection Cold water supply 22 mm connection Combination valve including hot water PRV 6 bar Tundish Drain valve...

Страница 9: ...outlets prior to the Electrastream connection Both of these connections are for 22 mm pipe 3 2 Heating system a The total output from the Electrastream for hot water and heating is 9 kW 240 V having...

Страница 10: ...possible to and lower than the safety device with no more than 600 mm of pipe between the valve outlet and the tundish 3 5 The discharge pipe D2 The discharge pipe D2 from the tundish should Have a v...

Страница 11: ...Contain a mechanical seal not incorporating a water trap which allows water into the branch pipe without allowing foul air from the drain to be ventilated through the tundish b Be a separate branch pi...

Страница 12: ...ed for a straight length of 28 mm copper discharge pipe D2 from a G temperature relief valve is 18 m Subtract the resistance for 4 No 28 mm elbows at 1 0 m each 4 m Therefore the maximum permitted len...

Страница 13: ...current and temperature rating for the requirements of the Electrastream as well as all other electrical requirements within the property It is advised to turn the switch off when hot water and heatin...

Страница 14: ...d therefore only a mains cable not supplied is required to be installed through the cable gland located at the top of the RCD box This 3 core cable suitably sized is connected into the live neutral an...

Страница 15: ...15 Cont Fig 10 Wiring diagram standard arrangement...

Страница 16: ...system Grey vessel Maximum charge pressure 1 5 bar Maximum working temperature 90 C Maximum Working Pressure 3 bar Capacity 8 litres for maximum system expansion of 7 litres The vessel pre charged is...

Страница 17: ...arth wiring has been installed correctly b Check tri core heater cover Electrastream controller cover and all other electrical covers are correctly fitted c Check tundish is positioned so that any spi...

Страница 18: ...s failed see 5 17 HEAT 2 Indicates Eleement 2 is ON HEAT 2 Indicates heater element has failed see 5 17 HEAT 3 Indicates Eleement 3 is ON HEAT 3 Indicates heater element has failed see 5 17 VALVE Inid...

Страница 19: ...19 Cont Fig 12 Electrastream control unit display settings For error displays see 8 1...

Страница 20: ...within 2 of the set Target 65 C only one element will be on When the hot water is between 2 and 4 C below the set target then two elements will be on When the hot water within the cylinder is below 6...

Страница 21: ...re within the cylinder becoming too high the TPR valve will vent The heating system has its own Pressure relief valve PRV and in the event of the pressure within the heating system becoming too high t...

Страница 22: ...has to make special arrangements to the property s electrical supply to enable Electrastream to be used during both off peak and normal tariffs consult the installing electrician Boost can be used at...

Страница 23: ...er functions 4 How to set room thermostat 5 The function of the Pressure Relief Valves and Combination valve and that over pressure will cause steam and scalding water to be emitted from the discharge...

Страница 24: ...TPR valve and check that the water drains freely and safely to and from the tundish 10 Open combination PRV momentarily and close valve should shut off Repeat if valve sticks If valve will not shut o...

Страница 25: ...ths this is done by pressing the RCD Test or T button this should switch the supply off Reset RCD to On after test If the RCD appears not to be working correctly contact your installer or a qualified...

Страница 26: ...eat time t 60 o C 25 minutes 29 minutes Heat loss in 24 hrs 65 o C 0 97 kWh 1 06 kWh Heating System Expansion vessel size 8 litres Maximum system expansion 7 litres Expansion vessel pre charge pressur...

Страница 27: ...setup Check timers and target temperature on Electrastream Control unit are set correctly Trip cut out Check over temperature cut out Reset system by switching heating and hot water OFF and allow for...

Страница 28: ...hould not be run with all the radiators turned off unless there is a bypass valve in the system Check for air in the heating system Check that the cylinder temperature sensor has not been dislodged fr...

Страница 29: ...water that complies with current at the time of installation EU standards and is not fed with water from a private source d The unit must not be modified in any way e Being subjected to excessive pres...

Страница 30: ...30...

Страница 31: ...31...

Страница 32: ...Stuart Turner Ltd Henley on Thames Oxfordshire RG9 2AD ENGLAND Tel 44 0 1491 572655 Fax 44 0 1491 573704 info stuart turner co uk www stuart turner co uk Issue No 3619 1 02 Pt No 20908...

Отзывы: