Neptune Docking Station (P/N 0702-014-000)
1. Replace the offload pump impeller.
2. Replace the fresh water filter.
3. Perform procedure 6.8
Manually Raising & Lowering Docker Couplers
on
page 6-43 and verify that hall sensors operate properly, and that the stepper
motor extends and retracts the couplers without interruption. Leave the
docker top cover off after verifying hall sensor operation.
4. Complete the docker testing requirements in procedure 6.5
Testing
on page
6-19.
6-48
Содержание 0702-002-620
Страница 1: ......
Страница 3: ......
Страница 5: ......
Страница 15: ......
Страница 17: ......
Страница 19: ......
Страница 21: ......
Страница 22: ...Chapter 1 Operational Description...
Страница 23: ......
Страница 27: ......
Страница 28: ...Chapter 2 Ultra Rover Disassembly...
Страница 29: ......
Страница 31: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 2...
Страница 37: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 8...
Страница 42: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 13...
Страница 49: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 20...
Страница 81: ...4 Remove front cover assembly P N 0702 001 070 CH and place aside 2 52...
Страница 103: ......
Страница 105: ......
Страница 106: ...Chapter 4 Docker Disassembly...
Страница 107: ......
Страница 133: ......
Страница 134: ...Chapter 5 Troubleshooting...
Страница 135: ......
Страница 167: ......
Страница 168: ...6 33 Chapter 6 Technical Procedures...
Страница 169: ......
Страница 219: ......
Страница 220: ...Chapter 7 Installation...
Страница 221: ......
Страница 224: ...7 3...
Страница 228: ...Chapter 8 Appendices...
Страница 229: ......
Страница 231: ......