9
BOTTLE JACK ASSEMBLY
1. Familiarize yourself with the jack.
2. Attach the handle pieces making sure to align the holes on both the lowering valve and the handle
socket.
3. Line up the handle to the handle socket located on the side of the jack, then insert the handle inside
the handle socket.
4. Secure the handle in place inside the handle socket. Without any weight on the jack. Cycle the lift up
and down several times to insure the hydraulic system is operating properly. (Perform to the Air
Purge Procedure before first use.)
SYSTEM AIR PURGE PROCEDURE
IMPORTANT: BEFORE FIRST USE
All numbers in parenthesis () refer to the index number from the parts breakdown.
Perform the following Air Purge Procedure to remove any air that may have been introduced into the
hydraulic system as a result of product shipment and handing. This step is to be completed without and
weight on the jack.
1. Turn release valve counterclockwise one full turn to the open position.