Unpacking the Cabinet
1-4
Stratus ftServer V 2404, V 4408, V 6408, and V 6512 Hardware Installation Guide
(R004S)
Figure 1-1. Cabinet Packaged for Shipping
1. Check the packing list to verify that you have received the correct shipment.
2. Verify that the Tip-N-Tell and Shockwatch indicators on the outer sides of the
shipping container have not been activated.
C A U T I O N
!
If you received the wrong shipment, or if a handling
indicator has been activated,
do not proceed with the
unpacking
. Contact the CAC immediately.
3. Verify that the area through which you must move the system has adequate
clearance, as the following figures indicate:
shows the dimensions of a packaged 38U cabinet.
shows the clearances required at the installation site.
Include the height of the pallet jack when you calculate the overall system height.
upk001a
Ramp
Pallet
Tie-down
Straps
Transition
Plates
Lever Bar