
Page 7
Due to continuous product research and development,
the information contained herein is subject to change without notice.
www.stoddart.com.au
www.stoddart.co.nz
Plumbing Connections
Information
Installation
• The unit is supplied with a G 1½” BSP drainage connection
• The wastewater connection screws into the drainage connection� The wastewater MUST be tested for leakages after being installed
• The unit MUST be on a level surface for the water to drain properly
• The Bain Marie is fitted with an overflow which maintains the correct water level in the well
• Before use, the water purity needs be checked; high mineral water can corrode the elements and taint the water/food� If needed, a
filtration system should be installed
• The unit is supplied with a G ½” BSP Water Connection for filling the well� The water valve MUST be tested for leakages after being
installed
• It is recommended that the Bain Marie is connected to the water mains and drained to a tundish
• The unit must be connected to a drain and either a hot or cold water supply (hot produces quicker start up times) with an isolation tap
Waste Connection
Water Connection
Overflow Connection
Electrical Connection
IMPORTANT
This unit must be operated on potable water. If the water has a
high mineral content, pretreatment may be necessary or your
warranty could be voided.
IMPORTANT
This unit must be installed in accordance with AS/NZ 3500.1