
INSTALLATION
Commissioning
88
|DHE Connect | DHE Touch
www.stiebel-eltron.com
f
f
Tick the selected connected load and rated voltage on the ap-
pliance cover type plate (on both sides). Use a ballpoint pen
to do this.
f
f
Secure the appliance cover with the screw.
f
f
Fit the fascia to the appliance cover.
D
000
00
53
28
1
f
f
Switch the mains power ON.
Note
The display activates after approximately 1 minute.
f
f
Check the function of the appliance and the mini wireless
remote control.
f
f
Carry out quick commissioning for the most important set-
tings. You can also adjust the settings to your needs later via
the "Settings / Standard settings" menu.
11.1.1 Changing the connected load
If you select a connected load other than the 21 kW factory setting
for appliances with selectable connected load, take the following
steps.
Connect the appliance to the mains voltage for the conversion.
Proceed as described in chapter "Commissioning", but switch on
the mains voltage immediately after safety switch activation.
D
00000
53
27
6
1
2
1 Connected load button
2 Display
f
f
Press the connected load button briefly to wake up the dis-
play. The set connected load flashes.
f
f
Then press the button repeatedly until the desired connected
load appears on the display. The connected load selected is
adopted immediately.
11.1.2 Mini wireless remote control
The mini wireless remote control is factory registered to the de-
vice. If no data transmission takes place during commissioning,
repeat the learning process (see chapter "Installation options /
Registering the mini wireless remote control".
11.1.3 Appliance handover
f
f
Explain the appliance function to users and familiarise them
with its operation.
f
f
Make the user aware of potential dangers, especially the risk
of scalding.
f
f
Hand over the instructions.