9
ASSEMBLE INSTRUCTIONS
STEP 18
NOTE:
For shipping purpose, the
Bolt, Hex Head (M8×p1.25×16mm) (123)
are attached on the
Left and
Right Upper Handlebar (6, 7).
a. Remove the
Bolt, Hex Head (M8×p1.25×16mm) (123)
from the
Left and Right Upper Handlebar (6, 7).
b. Following the inset drawing, insert the
Right Upper Handlebar (7)
onto the
Right Pivoting Arm (9)
and
secure with the
Bolt, Hex Head (M8×p1.25×16mm) (123).
c. Repeat the above procedure to insert and secure the
Left Upper Handlebar (6)
onto the
Left Pivoting
Arm (8).
STEP 19
a. Place the
Front Rotator Cuff
–Pivoting Arm (31)
and the
Back Rotator Cuff
–Pivoting Arm (32)
at both
sides of the
Right Pivoting Arm (9).
b. Bolt the Rotator Cuffs together with the
Screw, Round Head (M5xp0.8x15mm) (80).
c. Repeat the above procedure to place the
Front Rotator Cuff
–Pivoting Arm (31)
and the
Back Rotator
Cuff
–Pivoting Arm (32)
at both sides of the
Left Pivoting Arm (8).
For the final step, make sure all the bolts and nuts are tighten securely before using.
Содержание PR-7505
Страница 16: ...PRODUCT PARTS DRAWING ...