© 2008 Stevens AeroModel.
Page 31 of 52
Continue installing turbulators T2 and T3 (assembled in step 1) use the same technique as outlined above,
however, T2 and T3 are not notched to set rib spacing.
22. Install the 1/8 in. balsa center section leading edge parts LE2 (sheet 10/21). There are two each of LE2 install
one spanning right and left ribs R1. Install the second by laminating on top of the first to double the thickness of
this part. See illustrations below.
23. Lay in the leading edge which is composed of ¼ in. square balsa stock. Start the balsa stock at R1 and allow it
to extend beyond rib R5. Bond using thin CA glue. Trim and sand balsa stock flush with outer surface of wing
panel at R5. Repeat for opposite side of wing.
24. Use the remaining carbon flat stock from step 6 and trim to 11 in. length.