Installation
41
a. Bleed the air out of the hydraulic system.
b. Check the oil level and add oil if needed.
c. Calibrate dump light system.
d. Be sure to check all clearances.
e. Set/check relief pressure(See chart below and steps on the following page).
a. Fill reservoir to site gauge, within 3” from the top (Roughly 25 Gallons).
Note: Petro-Canada Hydrex 32 (ISO 32) hydraulic oil is recommended.
b. When connections are secure, activate hydraulic flow by opening the ball valve on the
bottom of the reservoir. This will allow oil to flow from the reservoir to the pump.
Setting System Relief Pressure
0
10000
20000
30000
40000
50000
1000
1500
2000
2500
3000
3500
4000
4500
LOADER CAPACITY (POUNDS)
OPERATING PRESSURE (PSI)
54" HH
62" HH
62” HH Models: Never Exceed the Maximum Pressure of 3600 P.S.I.
54” HH Models: Never Exceed the Maximum Pressure of 4300 P.S.I.
Never adjust System Relief Pressure to allow Loader Capacity to
exceed chassis GVW and always perform a weight distribution before
installation and after System Relief Pressure adjustments to confirm
Loader Capacity and chassis compatibility.
Step 17: Operate hooklift.
Step 16: Fill reservoir and activate hydraulic flow.
Содержание Slider50
Страница 2: ...Slider50 Hooklift Manual Revisions Date of Revision Description of Revision Section Revised...
Страница 10: ...4 Slider50 Owner s Manual...
Страница 22: ...16 Slider50 Owner s Manual...
Страница 25: ...19 Acceptable Subframe Dimensions for Bodies...
Страница 26: ...20 Slider50 Owner s Manual Acceptable Subframe Dimensions for Bodies...
Страница 27: ...21 Acceptable Subframe Dimensions for Bodies...
Страница 28: ...22 Slider50 Owner s Manual Acceptable Subframe Dimensions for Bodies...
Страница 60: ...54 Slider50 Owner s Manual...