Installation
37
a. Use PTO brand specific installation instructions.
b. For cab controls, see controller assembly drawing for details:
96 INCH
2 SECTION 3 SECTION
PN 55534
144 INCH
PN 55540
192 INCH
PN 55541
PN 54746
PN 54747
PN 54748
1
20
4
In Cab Installation
19
5
19
6
3
17
14
CONTROL CABLES
TO VALVE BANK
13
Valve Bank Shown
For Reference
At Valve Installation
.
Y
T
Q
N
O
I
T
P
I
R
C
S
E
D
T
R
A
P
M
E
T
I
1
38351
VALVE CTRL CONSOLE 3LEVER RVC (3 Section Only)
1
1
37470
VALVE CTRL CONSOLE 2LEVER RVC (2 Section Only)
1
3
37475
CONTROLLER CTR LOCK LEFT BEND
1
4
37476
CONTROLLER CTR LOCK NO BEND (3 Section Only)
1
5
37474
CONTROLLER CTR LOCK RIGHT BEND
1
6
25933
BRKT CONTROLLER DECAL
1
13
37469
CABLE CONN. KIT FOR VD8A/VDM8
2/3
14
37471
CONTROL CABLE 96 IN WESCON
2/3
14
37472
CONTROL CABLE 144 IN WESCON
2/3
14
37473
CONTROL CABLE 192 IN WESCON
2/3
17
20057
CAP SCR 0.31-18X6.50 HHGR5 (3 Section Only)
2
17
0491
CAP SCR 0.31-18X4.00 HHGR5 (2 Section Only)
2
19
0343
WASHER 0.31 USS FLAT ZINC
4
20
0342
NUT 0.31-18 HHGR5 NYLOC
2
Step 12: Install cab and PTO controls.
Содержание Slider50
Страница 2: ...Slider50 Hooklift Manual Revisions Date of Revision Description of Revision Section Revised...
Страница 10: ...4 Slider50 Owner s Manual...
Страница 22: ...16 Slider50 Owner s Manual...
Страница 25: ...19 Acceptable Subframe Dimensions for Bodies...
Страница 26: ...20 Slider50 Owner s Manual Acceptable Subframe Dimensions for Bodies...
Страница 27: ...21 Acceptable Subframe Dimensions for Bodies...
Страница 28: ...22 Slider50 Owner s Manual Acceptable Subframe Dimensions for Bodies...
Страница 60: ...54 Slider50 Owner s Manual...