Operation
5
1. Stop the truck at the location you wish to unload.
2. Put the truck in
neutral
and engage the PTO.
3. Locate the black control lever labeled jib.
4. Pull jib lever the jib cylinder is fully retracted,
thus releasing tabs.
5. Locate the red lever labeled lift.
6. Pull lift lever until the body is on the ground and
can be detached. Return the hooklift to the
stored position and disengage the PTO.
Unloading Operation
Содержание Slider20
Страница 2: ...Slider20 Hooklift Manual Revisions Date of Revision Description of Revision Section Revised...
Страница 14: ...8 Slider20 Owner s Manual...
Страница 33: ...Installation 27 PN 44045 Hydraulic Schematic PN 44045...
Страница 34: ...28 Slider20 Owner s Manual PN 41133 Wiring Schematic PN 41133...
Страница 42: ...36 Slider20 Owner s Manual...