INS_CUST UL REV D
Page 6
2 - SPECIFICATIONS
B. CLEARANCES
From unit left & right sides
1"
25mm
To fl ooring under fi replace
0
0
Unit top to ceiling
6"
152mm
Unit side to adjacent sidewall
1"
25mm
Figure 2B
WARNING: NON-COMBUSTIBLE ZONE: USE ONLY NON-COMBUSTIBLE MATERIAL IN THIS AREA FOR ENTIRE WIDTH OF
FIREPLACE. DO NOT USE WOOD, SHEETROCK, ETC., IN THIS ZONE.
NOTE: OTHER CLEARANCES APPLY. ALL CLEARANCES MUST BE MAINTAINED.
REFER TO PAGE 11 FOR MORE INFORMATION.
SPECIFICATIONS
Model #
B-VENT
OA
REG PV
IN-LINE PV
BTU’S
NG
ORIFICE
LP
ORIFICE
4-SS-2-GL
4X2 SINGLE SIDED
8”
10”
RSO12
RSIF160
60,000
(3X) #43
(3X) #55
5-SS-2-GL
5X2 SINGLE SIDED
8”
10”
RSO12
RSIF160
80,000
(4X) #43
(4X) #55
6-SS-2-GL
6X2 SINGLE SIDED
10”
10”
RSO14
RSIF180
100,000
(5X) #43
(5X) #55
7-SS-2-GL
7X2 SINGLE SIDED
10”
10”
RSO14
RSIF180
120,000
(6X) #43
(6X) #55
4-SS-3-GL
4X3 SINGLE SIDED
8”
10”
RSO12
RSIF160
60,000
(3X) #43
(3X) #55
5-SS-3-GL
5X3 SINGLE SIDED
8”
10”
RSO12
RSIF160
80,000
(4X) #43
(4X) #55
6-SS-3-GL
6X3 SINGLE SIDED
10”
10”
RSO14
RSIF180
100,000
(5X) #43
(5X) #55
7-SS-3-GL
7X3 SINGLE SIDED
10”
10”
RSO14
RSIF180
120,000
(6X) #43
(6X) #55
Содержание 4-SS-2-GL
Страница 2: ...INS_CUST UL REV D Page 2 ...
Страница 20: ...INS_CUST UL REV D Page 20 Figure 8F 2 F HORIZONTAL TERMINATION VENT CAP LOCATION CLEARANCES 8 VENTING ...
Страница 26: ...INS_CUST UL REV D Page 26 9 GALAXY ELECTRIC Figure 9B B INSTALL ...
Страница 27: ...Page 27 16400 7800 GSS REV D 9 GALAXY ELECTRIC C SERVICE TROUBLESHOOTING Figure 9C ...