Page 13
16400-7800 GSS REV D
5 - MANTEL REQUIREMENTS
NON-COMBUSTIBLE ZONE -
NOT
USING THE PROVIDED 1/2" STANDOFFS
Figure 5.2
NOTE: Refer to Page 33 for more information on fi nishing the wall.
The fi replace has standoff s installed on the front of the fi replace standard from the factory. They are located on the left,
center and right front hood of the fi replace and are to ensure that the 1/2" [12.7mm] required clearance to combustibles
on the surface of the fi replace is maintained.
If the standoff s are removed, only non-combustible material can be installed against the surface of the fi replace such as
a non-combustible backer cement board. 1/2” [12.7mm] minimum thickness must be used in the 15” [381mm] between
the top of the 3’’ trim to the combustible framing the full width of the fi replace. The 15” includes a 7” [178mm] minimum
above the top of the fi replace that is recommended for ease of attachment.
Refer to Figure 5.2 on below for requirements when not using the provided 1/2" standoff s.
Refer to Figure 5.1 on Page 12 for a standard installation using the provided 1/2" standoff s.
1/2" [12.7mm] Standoff
Содержание 4-SS-2-GL
Страница 2: ...INS_CUST UL REV D Page 2 ...
Страница 20: ...INS_CUST UL REV D Page 20 Figure 8F 2 F HORIZONTAL TERMINATION VENT CAP LOCATION CLEARANCES 8 VENTING ...
Страница 26: ...INS_CUST UL REV D Page 26 9 GALAXY ELECTRIC Figure 9B B INSTALL ...
Страница 27: ...Page 27 16400 7800 GSS REV D 9 GALAXY ELECTRIC C SERVICE TROUBLESHOOTING Figure 9C ...