![Stellar Hearth Products 3-IDOD-2-GL Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/stellar-hearth-products/3-idod-2-gl/3-idod-2-gl_installation-and-operating-manual_1371586015.webp)
Page 15
16400-7820 GIDOD REV A
C
HEADER ENGINEERED
FOR SPECIFIC CONSTRUCTION
WALL SHEATHING
FRONT VIEW
1 [25] ***
1 [25] ***
D
The steel 3” [76] surface all around the fireplace opening can not be covered with any type of material.
Glass and decorative framing will be placed on top.
E
EXTERIOR
INTERIOR
5 - FRAMING & MANTEL REQUIREMENTS
IMPORTANT FRAMING NOTE:
INTERIOR FRAMING IS RECOMMENDED TO BE DONE
AFTER THE FIREPLACE IS INSTALLED
FOR GREATER ACCURACY.
Содержание 3-IDOD-2-GL
Страница 32: ...INS_CUST UL REV E Page 32...