![Stellar Hearth Products 3-IDOD-2-GL Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/stellar-hearth-products/3-idod-2-gl/3-idod-2-gl_installation-and-operating-manual_1371586012.webp)
INS_CUST UL REV E
Page 12
INTERIOR
4 - PREPARE THE FIREPLACE
CAUTION: FIREPLACE IS NOT LOAD-BEARING.
NOTE: OTHER CLEARANCES APPLY. ALL CLEARANCES MUST BE MAINTAINED.
A. STANDOFF INSTALLATION
STEP 1: Refer to Figure 4A.1
The two (2) standoffs will be shipped in a flat state placed on the firebox
top. Locate the standoffs and loosen the screws holding them in place.
Figure 4A.2
Figure 4A.3
Placement of the standoffs and exterior nailing
flange.
STEP 2: Refer to Figure 4A.2
Fold the center of the standoff up and both ends out at the perforated
lines. Using Figure 3A.2 for reference, locate the second pre-installed
screw on the firebox top at each standoff location. Remove the screw,
pivot the folded standoff into location and re-install the screw to secure
the standoff. Tighten up the screw that was loosened in Step 1.
PIVOT FOLDED STANDOFF
AND SECURE
LOOSENED SCREW
The IDOD See Through
fireplace has a quantity of four
(4) standoffs that are secured
with two (2) screws each (left
and right sides of top).
STANDOFFS
EXTERIOR NAILING
FLANGE
Figure 4A.1
LOOSEN SCREW
LOOSEN SCREW
AND FOLD EACH
AND FOLD EACH
STANDOFF
STANDOFF
REMOVE
REMOVE
SECOND SCREW
SECOND SCREW
B. EXTERIOR NAILING FLANGE
Содержание 3-IDOD-2-GL
Страница 32: ...INS_CUST UL REV E Page 32...