D1
- 9 -
D1 9/2011
Operators Manual for Drilling Machine
5.2 Operating instructions
The machine is supplied in a metal box. Check if all parts listed in paragraph 3
are included. Steel elements of the drilling machine are protected for transit and
storing with grease film. Before first start up of the machine all grease should be
removed. Before each use all spoke handles should be screwed into pinion.
Control panel,
Control panel includes:
- 2-position main switch (01),
- START-STOP button (02),
a) In order to start the machine press the main switch (01) on “I“ button. Now you
can start the motor by pressing green button „ I” (02).
b) Stop the motor by pushing the red button, “O” (then the motor is switched OFF
,
but the electromagnetic base is still ON) (02).
c) To move machine into next drilling spot, stop the motor as described above
and push the magnet switch (01) to the position “O”.
Drawing 4.
Control panel
01
02