![SteelMax Rail Runner 2 Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/steelmax/rail-runner-2/rail-runner-2_operators-manual_1370102027.webp)
Rail Runner 2
Rail Runner 2
– Operator’s Manual
27
Use the 0.75 m (2.5 ft) signal cable to connect the motorized vertical slide to the
carriage (Fig. 15). Then, use the 0.5 m (1.5 ft) signal cable to connect the sensor to
the vertical slide. If the vertical slide is not used, connect the sensor to the carriage
with the 1 m (3 ft) signal cable.
Fig. 15.
Connecting the tracking sensor to the carriage
0.5 m (1.5 ft) signal cable
0.75 m (2.5 ft) signal cable
Содержание Rail Runner 2
Страница 38: ...Rail Runner 2 Rail Runner 2 Operator s Manual 38 M6x20 M6x16 M6x16 M6x35 6 4 6 4 M6x20 M6x16 6 4 ...
Страница 52: ...Rail Runner 2 Rail Runner 2 Operator s Manual 52 6 WIRING DIAGRAM ...
Страница 53: ...Rail Runner 2 Rail Runner 2 Operator s Manual 53 ...
Страница 54: ...Rail Runner 2 Rail Runner 2 Operator s Manual 54 ...
Страница 55: ...Rail Runner 2 Rail Runner 2 Operator s Manual 55 ...