![SteelMax Rail Runner 2 Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/steelmax/rail-runner-2/rail-runner-2_operators-manual_1370102014.webp)
Rail Runner 2
Rail Runner 2
– Operator’s Manual
14
3.3. Positioning on a straight track
Set the power switch, arc ignition switch, oscillation switch, and direction switch to
‘O’. Next, set the levers to OFF (
1
, Fig. 6), and then loosen the knob (
2
) fully
to retract the gear (
3
). Then, put the carriage so that the mounting brackets are on
the rail (
4
,
5
).
Fig. 6.
Putting the carriage on a straight track
Mounting bracket
Mounting bracket
2
3
5
Gear retracted
1
4
Содержание Rail Runner 2
Страница 38: ...Rail Runner 2 Rail Runner 2 Operator s Manual 38 M6x20 M6x16 M6x16 M6x35 6 4 6 4 M6x20 M6x16 6 4 ...
Страница 52: ...Rail Runner 2 Rail Runner 2 Operator s Manual 52 6 WIRING DIAGRAM ...
Страница 53: ...Rail Runner 2 Rail Runner 2 Operator s Manual 53 ...
Страница 54: ...Rail Runner 2 Rail Runner 2 Operator s Manual 54 ...
Страница 55: ...Rail Runner 2 Rail Runner 2 Operator s Manual 55 ...