![SteelMax Rail Runner 2 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/steelmax/rail-runner-2/rail-runner-2_operators-manual_1370102016.webp)
Rail Runner 2
Rail Runner 2
– Operator’s Manual
16
3.4. Positioning on a curved track
Use the 6 mm hex wrench to loosen four screws (
1
, Fig. 8), and then put the carriage
on the track. Rotate two roller brackets (
2
) to put the rollers into the grooves, and
then set the levers to ON (
3
). Next, move the carriage back and forth to make sure
that it moves smoothly. Then, tighten the screws (
1
) and use the knob (
4
) to engage
the gear with the rack as described in “Positioning on a straight track”.
Fig. 8.
Rotating the rollers for a curved track
1
2
2
3
Содержание Rail Runner 2
Страница 38: ...Rail Runner 2 Rail Runner 2 Operator s Manual 38 M6x20 M6x16 M6x16 M6x35 6 4 6 4 M6x20 M6x16 6 4 ...
Страница 52: ...Rail Runner 2 Rail Runner 2 Operator s Manual 52 6 WIRING DIAGRAM ...
Страница 53: ...Rail Runner 2 Rail Runner 2 Operator s Manual 53 ...
Страница 54: ...Rail Runner 2 Rail Runner 2 Operator s Manual 54 ...
Страница 55: ...Rail Runner 2 Rail Runner 2 Operator s Manual 55 ...