-38-
ST1007/12/14 15" & 20" Planers (Mfd. Since 3/16)
Tensioning/Replacing
V-Belts
After approximately 16 hours of operation,
V-belts will stretch and seat into pulley grooves
and need to be properly tensioned to avoid
severely reducing life of V-belts.
Three V-belts transfer power from the motor to the
cutterhead, and then to the infeed and outfeed roll-
ers with the use of the drive chain system. To ensure
efficient transfer of power to these systems, make
sure the V-belts are always properly tensioned and in
good condition.
If the V-belts are worn, cracked, or damaged, replace
them. Always replace the V-belts with a matched set
of three, or belt tension may not be even among the
belts, causing premature belt failure.
V-belts and pulleys will be hot after operation.
Allow them to cool before handling.
Tools Needed
Qty
Phillips Screwdriver ............................................................. 1
Open-End Wrench 19mm.................................................. 1
To tension/replace V-belts:
1. DISCONNECT MACHINE FROM POWER!
2. Remove V-belt cover from left side of machine to
expose belts, as shown in Figure 49.
Note:
A collection of black belt dust at the bottom
of the belt cover is normal during the life of the
belts.
3. Remove front cabinet cover to access motor, as
shown in Figure 50.
Figure 50. Front cabinet cover removed to access
motor.
Motor Mount
Hex Nuts
Figure 49. Belt cover removed to expose V-belts
and pulleys.
V-Belts
Cutterhead
Pulley
Motor
Pulley
Содержание ST1007
Страница 76: ...ST1007 12 14 15 20 Planers Mfd Since 3 16 73...
Страница 80: ......
Страница 81: ......