Page 27 of 38
939564909 Rev B
®
Series 8 Table Assembly (cont.)
Synchronizing the Lifting Columns
Prior to initial use of the height adjustment function you must
"synchronize the system".
•Pr
ess the Down arrow until the worksurface comes to a stop at the
lowest position.
•R
elease the Down arrow.
•Pr
ess and hold the down arrow for approximately 5 seconds while
the table synchronizes itself. The surface will quickly lower itself
approximately 5mm, then rise approximately 5mm and finally settle
back to its lowest position.
After performing this function, the movement of all lifting columns
is synchronized by software inside the control box.
In the unlikely event that an error occurs, reset the control unit by
pressing the Up and Down buttons at the same time for 5
seconds. Then repeat the synchronizing sequence as previously
outlined above.
NOTE:
Mounting of CPU and
CPU holders: Maximum height
for the 2 units cannot exceed
20-1/2".
Before use, the table must be completely leveled,
front-to-back and side-to-side using the height
adjustable glides. Failure to do this could cause
the lifting columns to bind.
Before articulation, you must synchronize the
lifting columns as outlined below.
Digital Desk
Panel Controller
Standard
Controller
Push Button Stick-On
Controller
5
6
Finishing the Table Assembly (cont.)
7
PLEASE LEAVE THE USER GUIDE IN AN OBVIOUS
PLACE FOR THE END USER AFTER ASSEMBLY.
GLIDES
USER GUIDE
6
5