Page 22 of 46
939564902 Rev F
®
Attaching Control Box &
Wire Managers
Series 8 Bench Assembly
Align Control Module with (2) pre-drilled holes as shown.
Note: For easier access with cable routing, leave screws 1/2"
from installing all the way.
1
Install the wire management cableway on the underside of the worksurface
at the rear using pre-drilled holes.
2
WIRE MANAGER
CONTROL MODULE
#2 SQUARE DRIVE
WORKSURFACE SCREW
Supply and Wire Manager to be installed
NOTE:
Assemblies with a Nexsis Power
Access Door Package require the Power
at alternate locations as shown.