background image

Page 3 of 18

939564905 Rev E

®

Overview of Assembly Process

1) Determine the table configuration.
2) Attach legs to worksurface (with worksurface upside-down).
3) Attach feet to legs.
4) Attach control box and controller.
5) Connect and route cables.
6) Check for binding and finish leg attachment.
7) Attach wire manager and end caps.
8) Flip table upright and test function.
9) Level and clean it up.
  

10) PLEASE LEAVE THESE INSTRUCTIONS, AND THE USER GUIDE,
IN AN OBVIOUS PLACE FOR THE END USER AFTER THE ASSEMBLY.

TABLE OF CONTENTS:

4
5
6
7
7 - 9
10 - 11
12 - 14  
15 - 16
17
18

Let’s Get Started!...........................................................................................
Attaching Mounting Brackets to Legs............................................................ 
Attaching Legs to Worksurface......................................................................
Attaching Feet to Legs...................................................................................
Attaching Control Box & Controller................................................................
Connecting & Routing Cables........................................................................
Attaching Wire Manager & End Caps............................................................
Finishing the Table Assembly.........................................................................
Guidelines on Moving the Table.....................................................................
Wiring Guide..................................................................................................

PAGE(S):

Содержание 9 Series

Страница 1: ...16 247 2500 Or visit our website www steelcase com 2015 Steelcase Inc Grand Rapids MI 49501 U S A Printed in U S A Page 1 of 18 939564905 Rev E Tools required Bit Holder Power Drill Level Hardware Bag CABLE CLIP WORKSURFACE SCREW CONTROLLER SCREW CONTROL BOX SCREW FOOT BOLT LEG BOLT X 2 X 2 X 2 X 42 X 12 M6 X 1 0 X 12MM BOLT M6 X 1 0 X 25MM BOLT 10 12 X 2 SCREW 8 15 X 0 625 SCREW SILVER 10 10 X 1 ...

Страница 2: ... wider than the other like the plug illustrated in Figure 1 This plug will fit in a polarized outlet only one way If the plug does not fit fully in the outlet reverse the plug If it still does not fit contact a qualified electrical to install the proper outlet Do not change the plug in any way This product is for use on a nominal 120 V circuit No adapter should be used with this product DANGER Imp...

Страница 3: ...nd caps 8 Flip table upright and test function 9 Level and clean it up 10 PLEASE LEAVE THESE INSTRUCTIONS AND THE USER GUIDE IN AN OBVIOUS PLACE FOR THE END USER AFTER THE ASSEMBLY TABLE OF CONTENTS 4 5 6 7 7 9 10 11 12 14 15 16 17 18 Let s Get Started Attaching Mounting Brackets to Legs Attaching Legs to Worksurface Attaching Feet to Legs Attaching Control Box Controller Connecting Routing Cables...

Страница 4: ... Started Prepare a large open space to assemble the table Sweep the floor Screws and small parts can damage the worksurface Unpack the worksurface and place on the shipping blanket upside down REMEMBER You re looking at the UNDERSIDE of the worksurface Are you sure which side is left or right 1 2 1 2 ...

Страница 5: ...n securely NOTE Install 2 bolts A in the back of the mounting bracket before installing the 4 side screws B to ensure that the back of the mounting bracket is flush with the back of the motor box MOUNTING BRACKET M6 X 1 0 X 12MM BOLT A B B Layout the lifting columns ensuring that the wiring receptacle is faced towards the center of the worksurface 3 3 4 ...

Страница 6: ... still upside down on the floor turn the legs over and align the mounting brackets to the pre drilled holes in the top Install one fastener in each of the pre drilled pilot holes Then install the remaining fasteners in each of the remaining holes and tighten ALL screws securely Do not over tighten 5 10 10 X 1 075 SCREW 3 5 10 10 X 1 075 SCREW A B ...

Страница 7: ...each foot using the M6 X 1 0 X 25MM bolts provided Tighten securely NOTE The longer portion of the foot should be facing the front of the worksurface 7 M6 X 1 0 X 25MM BOLT FOOT HAT CHANNEL CLIP 10 10 X 1 075 SCREW 5 3 6 7 Locate and install each hat channel clip using fasteners provided Tighten securely ...

Страница 8: ...n Do not plug into the wall outlet power source yet 8 Route lifting column cables through the molded in channels on the underside of the control box and plug into ports 1 and 2 Install control box in the pre determined location using the pre drilled holes Take care to not damage the cables LIFTING COLUMN 2 CABLE LIFTING COLUMN 1 CABLE 10 12 X 2 SCREW POWER CABLE NOT YET 8 10 9 9 8 OR ...

Страница 9: ...troller cannot be installed until the worksurface is flipped over Once step 18 is performed the controller may then be installed NOTE Remove paper backing from controller before installation Digital Desk Panel Controller Standard CABLE CLIP PAPER BACKING Controller Push Button Stick On Controller 8 15 X 0 625 SCREW 11 12 NOTE If the table is plugged into a power source before the Digital Desk Pane...

Страница 10: ...olumns to the port on the control box on the opposite side of the lifting column to which the cable connects as shown below On larger tables it may be necessary to connect the cable to the control box port closest to the lifting column without using the control box s integral wire management slots LIFTING COLUMN 2 LIFTING COLUMN 1 CONTROLLER POWER FILTER NO FILTER FILTER 13 To Lifting Column To Co...

Страница 11: ...lugged into port A1 of the control box and only then plug unit into the power source Check function of the table by operating the lifting columns all the way up and down through their range of motion Lower the lifting columns completely and then unplug from the power source Confirm that all the screws are installed as shown and that the cables are managed correctly before proceeding TWIST TIE EXCE...

Страница 12: ...aps Install the wire manager to the underside of the worksurface by snapping the inner walls of wire manager into place on the hat channel clips The center of the wire manager should be aligned with the center of the worksurface 17 SNAP FIT HAT CHANNEL CLIP 16 ...

Страница 13: ...manager through the opening of the end cap to the exterior channel of the wire manager Route the power cable from the interior channel of the wire manager to the mouse hole in the end cap and behind the back side of the lifting columns 14 11 17 14 11 18 CONTROLLER CABLE EXTERIOR CHANNEL INTERIOR CHANNEL POWER CABLE MOUSE HOLE END CAP ...

Страница 14: ...f the end caps Align end caps with the wire manager and install on the underside of the worksurface around the outer edges of the lifting columns and mounting brackets Press down at the locations shown to bond the dual lock tape to the underside of the worksurface Non Handed End Caps A C B TIGHT FIT NO GAP RELEASE LINER 14 11 19 14 11 20 ...

Страница 15: ...ifting column as a brace when turning the table over as this may cause binding The top must be lifted free rotated and set down carefully After the table is in place connect power cord to power supply CAUTION Be sure to create a drip loop in the power cord before making the connection to a live wall socket to prevent electric shock if liquids spill on power cord 14 11 21 14 22 ...

Страница 16: ...own arrow until the worksurface comes to a stop at the lowest position Release the Down arrow Press and hold the down arrow for approximately 5 seconds while the table synchronizes itself The surface will quickly lower itself approximately 5mm then rise approximately 5mm and finally settle back to its lowest position After performing this function the movement of all lifting columns is synchronize...

Страница 17: ...and when tipped off the pallet at the new location 3 Before use in this location the table must again be completely leveled side to side and front to back Failure to do so may cause binding of the lifting columns and failure to operate properly 4 After moving the lifting columns must be re synchronized Refer to prior page Guidelines on Moving the Table WIRE MANAGEMENT CABLEWAY END CAP END CAP LEFT...

Страница 18: ...troller cable into the control box 4 Follow steps 8 9 11 14 and 19 20 to complete the wiring installation 5 Once you have completed the wiring use the wire managers to hold all the cables and minimize possible entanglements Wiring Guide LEFT LIFTING COLUMN FOOT GLIDE RIGHT LIFTING COLUMN CONTROLLER CONTROL BOX lifting columns in any way Never attach wires to the NOTE Vertical wire management solut...

Отзывы: