background image

Page 6 of 20

18719901 Rev G

®

Mounting Legs to Worksurfaces

MOTOR HOUSING

IS ALWAYS AT

FRONT OF LEG

Mounting Plate

Worksurface

Pilot Holes

= PILOT HOLE
= NO PILOT HOLE PROVIDED

For 2-Leg Tables:

SQUARE DRIVE SCREW

With the top still upside down on the floor, turn the 
base over (flipping is a 2 person job), and align the 
attachment plates to the pre-drilled holes in the top.

Loosely install one fastener in each of the pre-drilled 
pilot holes.

Don't install all fasteners until the unit has been 
operated through one cycle (Step 14).

7

Содержание 7.2 Series

Страница 1: ...ASE 888 783 3522 for immediate action by people who want to help you Outside the U S A Canada Mexico Puerto Rico and the U S Virgin Islands call 1 616 247 2500 Or visit our website www steelcase com 2015 Steelcase Inc Grand Rapids MI 49501 U S A Printed in U S A Page 1 of 20 18719901 Rev G Tools required 2 SQUARE DRIVE BIT Power Drill ...

Страница 2: ... manufacturer 4 Never operate this table if it has a damaged cord or plug if it is not working properly if it has been dropped or damaged or dropped into water 5 Keep the cord away from heated surfaces 6 Never drop or insert any object into any opening 7 Do not use outdoors 8 Do not operate where aerosil spray products are being used or where oxygen is being administered 9 For loading always put h...

Страница 3: ...SE LEAVE THESE INSTRUCTIONS AND THE USER GUIDE IN AN OBVIOUS PLACE FOR THE END USER AFTER ASSEMBLY 8 Check for binding and finish leg attachment 9 Flip table upright and test function TABLE OF CONTENTS 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Lets Get Started Attaching Stretchers Mounting Legs to Worksurface Attaching Control Box Wire Managers Connecting Routing Cables Attaching the Controller...

Страница 4: ...an damage the worksurface Put down a CLEAN shipping blanket to protect the worksurface Unpack the worksurface and place on the shipping blanket upside down 2 REMEMBER You re looking at the UNDERSIDE of the worksurface Are you sure which side is left or right Assembling a 90o corner table with a 2 piece worksurface 3 Jump to Appendix A now 3 ...

Страница 5: ...table assembly LEFT LIFTING COLUMN RIGHT LIFTING COLUMN CENTER LIFTING COLUMN STRETCHER Layout the left right and center if applicable lifting columns place the stretcher into each dovetail connect loosely Left right is determined from the end users point of view Once each lifting column has been engaged lightly tap each connection point with a rubber mallet 1 8 1 4 inch at a time until completely...

Страница 6: ...E PROVIDED For 2 Leg Tables SQUARE DRIVE SCREW With the top still upside down on the floor turn the base over flipping is a 2 person job and align the attachment plates to the pre drilled holes in the top Loosely install one fastener in each of the pre drilled pilot holes Don t install all fasteners until the unit has been operated through one cycle Step 14 7 ...

Страница 7: ...nt plate Loosely install one fastener in each of the pre drilled pilot holes Once the center lifting column is secured align the left and right lifting columns in a similar fashion by moving the plate so that all pre drilled holes are visible Don t install all fasteners until the unit has been operated through one cycle Step 14 NOTE Do not force the left or right lifting columns to perfectly fit t...

Страница 8: ...tion using pre drilled holes Install the wire managers to the underside of the worksurface Be sure to allow space for wires to bend gently without getting kinked and space for accessories to clamp onto the back edge of the worksurface 8 9 WIRE MANAGER Attaching Control Box Wire Managers ...

Страница 9: ...f the table Install the wire managers to the underside of the worksurface as shown Be sure to allow space for wires to bend gently without getting kinked and space for accessories to clamp onto the back edges of the worksurface 10 WIRE MANAGER Attaching Control Box Wire Managers cont ...

Страница 10: ...ting column and connect the terminal end to the control box Route these cables in the wire management cableway provided Refer to the Wiring Guide for more information on page 18 For optimal wire management connect lifting columns to the closest port on the control box Connecting Routing Cables ...

Страница 11: ...Route these cables in the wire management cableway provided 2000mm cables to the left and right lifting columns 1000mm cable to the center lifting column Refer to the Wiring Guide for more information on page 18 For optimal wire management connect lifting columns to the closest port on the control box PORT 1 PORT 2 PORT 3 Connecting Routing Cables cont ...

Страница 12: ...ver Once step 16 is performed the controller may then be installed NOTE Remove paper backing from contoller before installation Digital Desk Panel Controller Standard Controller Install the controller to the underside of the worksurface on the side preferred by the user We recommend it be placed toward the outside of the table to avoid interference in the workspace Push Button Stick On Controller ...

Страница 13: ... 18719901 Rev G Attaching the Controller cont 13 PAPER BACKING WIRE KEEPER CONTROL WIRE Install the wire keepers for the control wire Peel off paper backing and stick to worksurface Place wire into each wire keeper ...

Страница 14: ...he table base all the way through its range of motion and back again then lower to bottom and unplug unit Install the remaining fasteners in each of the remaining holes and tighten ALL screws securely Do not over tighten NOTE Leg removed from illustration for clarity Finishing the Leg Installation SQUARE DRIVE SCREW ...

Страница 15: ...nstall the 120v plug into the control box Secure the cord to the control box using the molded in clip Plug the cord into an outlet CONTROL BOX PLUG MOLDED CLIP 16 Route all cables through wire managers 18 Keep all cables clear of moving parts CAUTION Be sure to create a drip loop in the power cord before making the connection to a live wall socket to prevent electric shock if liquids spill on powe...

Страница 16: ...fting columns is synchronized by software inside the control box In the unlikely event that an error occurs reset the control unit by pressing the Up and Down buttons at the same time for 5 seconds Then repeat the synchronizing sequence as previously outlined above GLIDE NOTE Mounting of CPU and CPU holders Maximum height for the 2 units cannot exceed 20 1 2 Before use the table must be completely...

Страница 17: ...w location Before in use in the location the table must again be completely leveled side to side and front to back Failure to do so may cause binding of the lifting columns and failure to operate properly After moving the lifting columns must be re synchronized by holding down arrow on the Controller while the lifting columns seek to level themselves 1 2 3 4 DRAW BOLTS V BRACKETS LEFT LIFTING COLU...

Страница 18: ...Control Box Repeat this for each leg Connect the end of the Controller cable into the Control Box Follow Steps 9 11 to complete the wiring installation Once you have completed the wiring use the Wire Managers to hold all the cables and minimize possible entanglements NOTE Vertical wire management solutions are also available from Details Contact your local dealer or Steelcase com for more informat...

Страница 19: ...y surface 1 Appendix A 2 Piece Worksurface Assembly and align with wood spline or biscuits provided Install draw bolts and tighten with 5 16 or 7 16 open end 2 wrench Attach two 2 v channels using sixteen 16 screws per channel Optional Biscuits SCREWS V CHANNELS DRAW BOLTS SPLINE ...

Страница 20: ...ully mounted to the extension portion The spline or biscuits between the primary and Planar Alignment extension portions act to keep the worksurface halves aligned on the top surface If these parts fit loosely shim them using pieces of paper as shown WRONG IS NOT ALLOWED THIS CONDITION MIS ALIGNMENT PLANAR EXTENSION HALF PRIMARY HALF ALIGNMENT IMPROVED EXTENSION HALF PRIMARY HALF SLOT SPLINE FOLDE...

Отзывы: