Page 3 of 20
18719901 Rev G
®
Overview of Assembly Process
1) Determine the table configuration.
2) Assemble 2-piece worksurface (if applicable).
3) Assemble and attach stretchers.
4) Attach legs to worksurface (with worksurface upside-down).
5) Attach control box and wire managers.
6) Connect and route cables.
7) Attach the contoller.
10) Level and clean it up.
11)
PLEASE LEAVE THESE INSTRUCTIONS, AND
THE USER GUIDE, IN AN OBVIOUS PLACE
FOR THE END USER AFTER ASSEMBLY.
8) Check for binding and finish leg attachment.
9) Flip table upright and test function.
TABLE OF CONTENTS:
4
5
6 & 7
8 & 9
10 & 11
12 & 13
14
15 & 16
17
18
19 & 20
Lets Get Started!............................................................................................
Attaching Stretchers......................................................................................
Mounting Legs to Worksurface......................................................................
Attaching Control Box & Wire Managers.......................................................
Connecting & Routing Cables........................................................................
Attaching the Controller.................................................................................
Finishing the Leg Installation.........................................................................
Finishing the Table Assembly.........................................................................
Guidelines on Moving the Table.....................................................................
Wiring Guide..................................................................................................
Appendix A: 2-Piece Worksurface Assembly.................................................
PAGE(S):