19 of 30
5. OPERATING MODES AND LOAD CHART
5.1 DETAILS OF PRIORITY MODES
MODES
MEANING
REASON TO SELECT THIS MODE
MODE-1
S>G>B*
Suitable for the case where customers wants no
battery charging through grid supply. This mode
allows the battery to discharge approx. 40%-50% then
AC loads switch to grid source, if grid supply available.
MODE-2
(default)
S>G>B
This mode allows the battery to discharge approx.
40%-50% then A C loads switch to grid source, if grid
supply available. This mode allows the battery
charging through grid when battery discharge more
than 80%
MODE-3
S>B>G
This mode allows the battery to discharge aprox. 60%-
70% then AC loads switch to grid source, if grid supply
available. This mode allows the battery charging
through grid when battery discharge more than 80%.
MODE-4
S>G>B**
Suitable for areas where grid supply is available only
for 6-8 hours in a day. So, whenever grid available it
charges the battery up-to approx. 80% of its capacity
to make sure to get more battery backup in night time
as compared to above 3 modes.
MODE-5
G>S>B
Suitable for areas when sufficient solar power is not
available for long duration (i.e. in rainy days or where
solar panel non available due to some reason). By
selecting this mode PCU will run like conventional
home inverter.
Note: Above stated battery’s SOC in percentage is estimated (based on Battery Voltage only) but not
actual. This holds true for all percentage mentioned in the table above.
Table 5
Содержание SEOG Series
Страница 1: ...Optional two way IoT access STATCON Inspire Innovate Implement ENERGIAA...
Страница 12: ...This image shows a typical single line diagram showing use of SPD and earth connection there of 11 of 30...
Страница 27: ...26 of 30 APPENDIX 2 TECHNICAL SPECIFICATIONS...
Страница 28: ...27 of 30...