STARCRAFT TOWABLE
SECTION 4 – TOWING & SET-UP
SCT
4-25
Lower and install bottom of screen door into
the metal extrusion at the bottom of the door
opening.
Align top of door flush to inside wall. Fasten
the top of the screen door.
Lock the turn fasteners to secure the screen
door to the unit.
Fasten tent Velcro to the screen door sides.
Make sure the bottom tent corners are pulled
out for water run-off.
Содержание STARFLYER 2015
Страница 1: ...2015 CAMPING TRAILERS STARFLYER COMET 0197944 2015 PRINTED ON RECYCLED PAPER ...
Страница 2: ......
Страница 4: ......
Страница 10: ...TABLE OF CONTENTS STARCRAFT CAMPING TRAILER VI THIS PAGE IS INTENTIONALLY BLANK ...
Страница 92: ...SECTION 4 TOWING SET UP STARCRAFT TOWABLE 4 42 SCT THIS PAGE IS INTENTIONALLY BLANK ...
Страница 94: ...SECTION 5 SLIDEOUT SYSTEMS CAMPING TRAILER 5 2 THIS PAGE IS INTENTIONALLY BLANK ...
Страница 104: ...SECTION 6 ELECTRICAL SYSTEM STARCRAFT TOWABLE 6 10 30 THIS PAGE IS INTENTIONALLY BLANK ...
Страница 130: ...SECTION 9 HEATING COOLING STARCRAFT TOWABLE 9 2 CT THIS PAGE IS INTENTIONALLY BLANK ...
Страница 134: ...SECTION 10 APPLIANCES STARCRAFT TOWABLE 10 4 SCT THIS PAGE IS INTENTIONALLY BLANK ...
Страница 136: ...SECTION 11 ELECTRONICS CAMPING TRAILER 11 2 THIS PAGE IS INTENTIONALLY BLANK ...